Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

BALANCE POWER PROJECTS LIMITED

3 unique locations (41 components)

Active MW: 281.35 MW
Inactive MW: 338.99 MW
Kilmorack Power Station, River Beauly, By Beauly, Inverness-shire, IV4 7AL (2 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Generating Unit 1
Active • 2028-29 (T-4), 2022-23 (T-3)
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (16 components)
• Gas reciprocating engines
• Generating Unit 2
• The East West Interconnector (EWIC) is a 400kV HVDC link between Connah's Quay in Wales and Woodland in Ireland.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (23 components)
• 49.900MW/49.900MWh battery storage asset, 1 hour duration
• Gas fired CHP unit
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
Loading map...
Showing 3 locations