Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

AXLE ENERGY LIMITED

814 unique locations (5676 components) - Page 1 of 33

Active MW: 244.36 MW
Inactive MW: 29.42 MW
AB11 (5 components)

Domestic EV charger (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
AB13 (1 component)

Domestic EV charger

Active • 2025-26 (T-4)
AB14 (9 components)
• Domestic EV charger (2)
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.39 MW
AB16 (1 component)

Domestic EV charger

Active • 2024-25 (T-4)
0.03 MW
AB23 (4 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
AB25 (5 components)

Domestic EV charger (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.48 MW
AB30 (11 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.48 MW
AB34 (8 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
AB35 (4 components)
• Domestic EV charger (2)
• Domestic EV
Active • 2025-26 (T-4), 2025-26 (T-1) ...
AB39 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
AB45 (14 components)

Domestic EV charger (2)

Active • 2025-26 (T-1), 2024-25 (T-4) ...
7.39 MW
AB52 (11 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2024-25 (T-4), 2024-25 (T-1)
AB54 (4 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.48 MW
AB55 (3 components)

Domestic EV charger (2)

Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.48 MW
AL5 (101 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
16.43 MW
AL7 (37 components)
• Domestic EV
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
11.96 MW
AL8 (10 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-1), 2024-25 (T-4) ...
4.56 MW
AL9 (27 components)
• Domestic EV charger (2)
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
16.43 MW
B11 (7 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-4), 2025-26 (T-1) ...
19.04 MW
B14 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
B16 (5 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-4), 2025-26 (T-1) ...
B17 (9 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
B20 (7 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
7.59 MW
B23 (7 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2025-26 (T-4), 2025-26 (T-1) ...
0.05 MW
B24 (9 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-4) ...
Loading map...
Showing 25 locations