Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

ASE UK HOLDINGS LIMITED

9 unique locations (215 components)

Active MW: 5.49 MW
Inactive MW: 29.01 MW
195 Aylesone Rd, Leicester LE2 7QJ (34 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Brakes - Park Royal, Premier Park Road, London, NW10 7NZ (17 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
LAND AT CRITTALL ROAD WITHAM ESSEX CM8 3DE (8 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Manor Farm, Church Road, Maiden Newton, Dorchester, DT2 0AA (1 component)

Solar Voltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Neachley Ln, Shifnal TF11 8PQ (14 components)
• Load reduction on site supported by non-exporting standby generation.
• Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Plot G11 Bennett Street, Bridgend Industrial Estate, Bridgend, CF31 3SA (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2018-19 (T-1)
The Power House Commercial Road Wolverhampton WV1 3QS (11 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-4)
Threemiletown Solar Farm Trinlaymire Farm Linlithgow West Lothian (1 component)

Solar photovoltaic generation scheme connected to the distribution network

Active • 2025-26 (T-4)
Trostre Works Llanelli Carmarthenshire SA14 9SD (125 components)

Manufacturing site providing demand response

Active • 2025-26 (T-1), 2023-24 (T-4) ...
Loading map...
Showing 9 locations