ADD Renewables Limited

77 unique locations (349 components) - Page 1 of 4

Active MW: 12.75 MW
Inactive MW: 53.00 MW
10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2021-22 (T-1)
Asda Redditch, Jinnah Road, Redditch, B98 7ER (11 components)
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
BALL BEVERAGE PACKAGING, MAYNARD ROAD, EAST SEGRO PARK, BURTON LATIMER, KETTERING, NN15 5ZS (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (3 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Baunton WTW, A435, Baunton, Cirencester, United Kingdom, GL7 7BQ (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Berry Agile Solutions, Ellough Industrial Area, Ellough, Suffolk, NR34 7TB, UK (4 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-1), 2023-24 (T-4)
Berry, Corby BMS Sallow Road, Weldon Industrial Estate, Corby, Northamptonshire, NN17 5JX (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Bond Estates Milton Keynes MK1 1JJ (3 components)

The CMU component comprises of three 2MW Combined Cycle Gas Turbines (CCGT)

G2 Energy Limited Not Prequalified MK1
Inactive • 2020-21 (T-4), 2017-18 (T-1)
Brackley STW, BRACKLEY STW (NEW), Turweston Field, BRACKLEY Northamptonshire, NN13 5JB, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (3 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2021-22 (T-1)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Croft Road, Coventry, CV1 3AZ (2 components)

"Planet Ice - UK Croft Road, Coventry, CV1 3AZ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

ENEL X UK LIMITED Not Prequalified CV1
Inactive • 2017-18 (TR)
DEANSHANGER HL, DEANSHANGER HL, DEANSHANGER, MILTON KEYNES, MK19 6BJ, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Downing Street, Smethwick, West Midlands, B66 2PG (4 components)

"EMR European Metal Recycling Downing Street, Smethwick, West Midlands, B66 2PG The CMU Component reduces import demand by turning off equipment and other non-essential loads."

ENEL X UK LIMITED Not Prequalified B66
Inactive • 2017-18 (TR)
Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG (6 components)
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• Battery storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DE (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
2.81 MW
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (1 component)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4)
EMR Cardiff (Roath Dock), Dowlais Wharf, Dowlais Wharf, CF10 4ED (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
EMR Coventry, Webster Sidings, Coventry, CV6 5DJ (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
EMR Kingsbury, Trinity Rd, Tamworth, B78 2LB (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
2.81 MW
Loading map...