Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

[PARENT] Centrica plc

29 unique locations (493 components) - Page 1 of 2

Active MW: 0.00 MW
Inactive MW: 0.00 MW
6 Braham St, Aldgate, London, E1 8EE (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus. (2)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Blackshaw Rd, London SW17 0QT (10 components)

CHP on a hospital site

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
British Gas, Bothwell Road, Uddingston, Glasgow, G71 7TW (36 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Active • 2025-26 (T-4), 2024-25 (T-4) ...
British Gas, New Bridge Ln, Stockport, SK1 2HQ (24 components)

Office site with behind the meter bio-diesel generation - offsetting site load and exporting surplus

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cardiff Road, Barry, Vale of Glamorgsan, CF63 2YL (36 components)
• Gas Turbine CHP GT001A
• Gas Turbine CHP GT001B
• Steam Turbine CHP
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (15 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Centrica Brigg Power Station, Scawby Brook, Brigg DN20 9LT. (16 components)

Centrica Brigg Power Station is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Cobden Street, Montrose, Angus, DD10 8EA (16 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Denison Road, Selby, North Yorkshire YO8 8AN (24 components)
• Gas Turbine Cogeneration Unit
• One 8 MWe Gas Turbine Cogeneration Unit (GT2)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
Eastfield Road, North Killingholme, Immingham, North Lincolnshire, DN40 3LW (69 components)
• Steam Driven Turbo Alternator 8G-2 6.8 MWe
• Steam Driven Turbo Alternator 8G1 6,8 MWe
• Steam Driven Turbo Alternator 8G2 6,8 MWe
• ... and 2 more unique descriptions
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Forth Drove, Peterborough PE1 5NT (7 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Great Maze Pond, London, SE1 9RT (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Gunnels Wood Road, Stevenage, SG1 2NY, United Kingdom (30 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8D (11 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Harmire Road, Barnard Castle, County Durham, DL12 8DT (26 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Howard Road, Park Farm Industrial Estate, Redditch, B98 7SE (6 components)

Redditch 20MW Gas Peaker Project

Active • 2026-27 (T-4), 2024-25 (T-1) ...
Huntingdon, PE29 6WP (5 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
National Distribution Centre, Barnsdale Way, Grove Park, Leicester, LE19 1SU (10 components)

Distribution Centre with behind the meter back-up generation.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Newton Rd, Crawley, RH10 9TT (6 components)

Site with behind the meter diesel generation - offsetting site load and exporting surplus.

Inactive • 2020-21 (T-4), 2017-18 (T-1)
Park Road, Ware. Hertfordshire, SG12 0DP (33 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Poplar Avenue, King' Lynn, PE34 3AL (14 components)

Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to …

Active • 2026-27 (T-4), 2025-26 (T-4) ...
Priory Street, Ware, Hertfordshire, SG12 0DJ (17 components)

On-site existing CHP generating unit

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (7 components)

A Prospective New Build Battery Storage facility

Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (3 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 25 locations