CMU WILL_C

9 unique locations - 1377.0MW total capacity

Britned Convertor Station, Gate C, Grain Road, Isle of Grain, Kent, ME3 0AE (15 components)
• BritNed is a 1200MW (TEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a 1320MW (CEC) electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
• BritNed is a electricity interconnector connecting the electricity transmission systems in the Netherlands and Great Britain.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1105.23 MW
Cottam EDF Energy (Cottam Power) Ltd, Outgang Lane, Cottam, Retford, DN22 0NP (8 components)
• CMU consisting of multiple reciprocating engines and alternators
• Cottam Power Station CMU 1 CT1-17 = 100% (T_COTPS-1) + 25% (T_COTPS-S)
• Cottam Power Station CMU 3 CT3-17 = 100% (T_COTPS-3) + 25% (T_COTPS-S)
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
442.31 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (14 components)
• 14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• District heating implementation of two gas CHP engines with no auxilliary load
• OCGT from Grain U1. Fuel is Gas Oil as specified in BS 2869 Class A2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Leighton Hall Farm, Middlewich Road, Leighton, Crewe, CW1 4QH (4 components)
• 10 x 2MW/2MWh containerised Energy Storage System Units to be installed on designated land at Leighton Hall Farm.
• Unit 1 Cruachan pumped storage hydro plant
Inactive • 2023-24 (T-4), 2022-23 (T-3)
North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Plot C Land at Severn Road Avonmouth BS10 7SE (3 components)

The CMU will be formed of multiple individual Batteries. This site is to include a Battery Energy Storage System (BESS) that can either operate as import or export at will. …

Inactive • 2023-24 (T-4), 2022-23 (T-4)
25.50 MW
Loading map...
Showing 9 locations