Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU WILL_C

6 unique locations - 1377.0MW total capacity

BARNS UNIT C AYCHLEY FARM MARKET DRAYTON SHROPSHIRE TF9 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
204.00 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
3.86 MW
LAND AT L C P AUTOSURE BRIDGE ROAD ASHFORD TN23 1BB (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
Active • 2024-25 (T-4), 2023-24 (T-1) ...
33.22 MW
Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH (47 components)
• A gas engine CHP site providing hot water to a local district heating network
• One of three CHP in a horticultural environment
• One of three CHP in a horticultural environment.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
38.34 MW
SHED BARN C NORTH ROAD ABINGTON CAMBRIDGESHIRE CB21 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
178.50 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Component has yet to be procured.
Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
113.57 MW
Loading map...
Showing 6 locations