CMU WILL_C

2 unique locations - 1377.0MW total capacity

North Avenue, Marston Green, Birmingham, B40 1NT. (12 components)
• Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.
• Import/Export metering with diesel generation at a retail store
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (9 components)
• CMU consisting of multiple reciprocating engines and alternators
• Component has yet to be procured.
Inactive • 2023-24 (T-1), 2022-23 (T-3) ...
113.57 MW