Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU SP_CMU

19 unique locations - 2.8MW total capacity

10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2021-22 (T-1)
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (3 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
Brackley STW, BRACKLEY STW (NEW), Turweston Field, BRACKLEY Northamptonshire, NN13 5JB, (6 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-1), 2019-20 (T-1)
DEANSHANGER HL, DEANSHANGER HL, DEANSHANGER, MILTON KEYNES, MK19 6BJ, (7 components)
• The CMU Component reduces import demand by turning on back up generation.
• Unproven DSR Component
Inactive • 2022-23 (T-4), 2020-21 (T-1) ...
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DE (6 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-1)
Eathorpe RI, Eathorpe, Leamington Spa, Warwickshire, CV33 9DF (3 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-1)
7.97 MW
Great Houghton HL, GT HOUGHTON HL, Leys Lane, Great Houghton, NORTHAMPTON, NN4 0AN, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
Ise Valley TPS, WELLINGBOROUGH-ISE VALLEY TPS, Irthlingborough Road, WELLINGBOROUGH Northamptonshire, NN8 1RA, (8 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
LAND AND BUILDINGS LYING TO THE SOUTH EAST OF ROMAN ROAD WHEATLEY OX33 1LH (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2022-23 (T-3), 2020-21 (T-1)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Inactive • 2023-24 (T-1)
49.98 MW
Loading map...
Showing 10 locations