CMU SP_CMU

44 unique locations - 2.8MW total capacity

10-14 Birmingham Road, West Bromwich, B71 4LD (5 components)
• Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2022-23 (T-4), 2021-22 (T-1)
17.26 MW
Banbury Power Hennef Way Grimsbury Banbury OX16 3WA (3 components)

Banbury Power will be a 12MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 6MW …

Inactive • 2019-20 (T-1)
11.29 MW
Beanfield No 1 HL, BEANFIELD #1 HL, Uppingham Road, CORBY Northamptonshire, NN17 2UJ (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
6.28 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (24 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.26 MW
Bond Estates Milton Keynes MK1 1JJ (3 components)

The CMU component comprises of three 2MW Combined Cycle Gas Turbines (CCGT)

Inactive • 2020-21 (T-4), 2017-18 (T-1)
5.35 MW
Brackley STW, BRACKLEY STW (NEW), Turweston Field, BRACKLEY Northamptonshire, NN13 5JB, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.91 MW
Corby 3 - Sallow Road, Hunters Court, Corby, Northamptonshire, NN17 5JX (10 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2024-25 (T-4), 2023-24 (T-1) ...
6.28 MW
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (9 components)
• The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
• The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
27.51 MW
Croft Road, Coventry, CV1 3AZ (2 components)

"Planet Ice - UK Croft Road, Coventry, CV1 3AZ The CMU Component reduces import demand by turning off equipment and other non-essential loads."

Inactive • 2017-18 (TR)
1.15 MW
DEANSHANGER HL, DEANSHANGER HL, DEANSHANGER, MILTON KEYNES, MK19 6BJ, (7 components)

The CMU Component reduces import demand by turning on back up generation.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
0.92 MW
Loading map...
Showing 10 locations