CMU PPCW21

2 unique locations - 8.2MW total capacity

Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Storage (Duration 1h) PIVOTED POWER LLP New Build Generating CMU
Inactive β€’ 2021-22 (T-1)
Cowley Substation, Blackberry Lane, Garsington, Oxfordshire, OX44 9BD (8 components)
β€’ The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
β€’ The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
38.12 MW
Loading map...
Showing 2 locations