CMU NDSR58

1 unique locations - 21.5MW total capacity

BURNLEY WHARF, MARINE PARADE, SOUTHAMPTON, SO14 5JP (7 components)
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU is a coal-fired set in the Uskmouth power station. This is a mothballed set for which TEC may be sought. As the connection agreement shows, the site has the CEC to export to this quantity, but it will be a matter of securing TEC (of some form) if this set is to come back on the bars.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
Loading map...
Showing 1 locations