CMU LOCHAY

3 unique locations - 39.9MW total capacity

Braunton Road Ashford Barnstaple Devon EX31 4BR (3 components)

Water treatment centre

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Lochay Power Station, Killin, Stirling, FK21 8UA (23 components)
• Genset 1.
• Genset 2.
• Genset 2. ROCable hydro units within the BMU are not included in the CMU.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
83.08 MW
Milton Keynes Hospital NHS Trust, Standing Way, Eaglestone, Milton Keynes, MK6 5LD (22 components)
• 3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road
• Behind the Meter Generation
• CMU consisting of multiple reciprocating engines and alternators
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...