2 unique locations - 9.0MW total capacity

WEPA Bridgend Paper Mill, Llangynwyd, Mid Glamorgan, South Wales CF34 9RS (10 components)

Existing Generation on existing site - CHP

Active • 2027-28 (T-4), 2026-27 (T-4) ...
36.28 MW
The Heat Station Harbour Parade, Southampton, Hampshire, SO15 1BA (41 components)
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.430MW as per the 3 highest export peaks
• 1.0MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• ... and 1 more unique description
Active • 2025-26 (T-4), 2025-26 (T-1) ...
32.05 MW