Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU F21082

9 unique locations - 4.7MW total capacity

Asda Aintree, Ormskirk Road Aintree, Liverpool, L10 3LN (11 components)
• BATTERY ENERGY STORAGE SYSTEM
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
16.58 MW
Asda Ashton Queens Road, Queens Road, Ashton Under Lyne, OL6 8ER (11 components)
• Load curtailment
• Load curtailment from refridgeration
• battery storage unit
Active • 2028-29 (T-4), 2025-26 (T-4) ...
19.47 MW
Asda Gravesend, Thames Way , Gravesend, DA11 0DQ (11 components)
• Battery Energy Storage System
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
19.38 MW
Asda New Ollerton, 118 Forest Road New Ollerton, Newark, NG229PL (11 components)
• Load curtailment
• Load curtailment from refridgeration
• On-site gas turbine back-up generation which can either reduce site import consumption or export to the grid (via a separate MPAN)
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.11 MW
Asda Oldbury, Wolverhampton Road , Oldbury, B69 4PU (11 components)
• Existing CMU comprising of Solar PV and associated plant.
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
15.52 MW
Asda Perry Barr, Walsall Road Perry Barr, Birmingham, B42 1AB (11 components)
• Battery Energy Storage System
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
19.38 MW
Asda Shepshed, Charnwood Road , Shepshed, LE12 9QE (11 components)
• Load curtailment
• Load curtailment from refridgeration
• The CMU component consist of gas fired reciprocating engines, organic rankine cycle turbines and stack gas-recovery carbon capture to be installed on designated land at Rhodesia Power Limited, Highgrounds Industrial Estate, Highgrounds road, Rhodesia, Worksop, S80 3AT
Active • 2028-29 (T-4), 2025-26 (T-4) ...
27.46 MW
Asda Wath Upon Dearne, 107/111 High Street Wath Upon Dearne, Rotherham, S63 7PX (11 components)
• An Existing diesel grid support plant
• Load curtailment
• Load curtailment from refridgeration
Active • 2028-29 (T-4), 2025-26 (T-4) ...
18.00 MW
Asda Ystalyfera, Glan YR Afon Godrer Graig, Ystalyfera, SA9 2LW (11 components)
• Existing 25 MW storage site using Lithium Ion Batteries
• Load curtailment
Active • 2025-26 (T-4), 2025-26 (T-1) ...
14.81 MW
Loading map...
Showing 9 locations