Home Technologies Companies Locations Map Explorer FAQ Trading Board ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU END007

2 unique locations - 5.2MW total capacity

Imperial College London, South Kensington Campus, SW7 2AZ (27 components)
• A 4.5MW gas fired reciprocating engine CHP (Engine 1).
• A 4.5MW gas fired reciprocating engine CHP (Engine 2).
Active • 2026-27 (T-4), 2025-26 (T-4) ...
28.35 MW
TBD (45 components)
• Aggregation of several flexible industrial loads
• Aggregation of several flexible industrial loads and permitted on-site generation
• Aggregation of several flexible industrial loads and permitted on-site generation.
• ... and 1 more unique description
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Loading map...
Showing 2 locations