CMU DSRL41

5 unique locations - 1.7MW total capacity

PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
β€’ 0.500MW Battery Energy Storage System
β€’ 0.5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
2.27 MW
MOONSHILL QUARRY, STOKE HILL, STOKE ST. MICHAEL, RADSTOCK, BA3 5JU (6 components)
β€’ 0.1MW of demand reduction
β€’ 3MW of DSR
β€’ Turn down Component
Inactive β€’ 2023-24 (T-4), 2022-23 (T-4) ...
12.96 MW
FROZEN FOODS FACTORY SUPPLY, WHAPLOAD ROAD PRIMARY SUBSTATION, REAR OF 203, WHAPLOAD ROAD, LOWESTOFT, SUFFOLK, NR32 1XQ (3 components)
β€’ 0.3MW of demand reduction
β€’ Turn down component
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1) ...
10.37 MW
FEEDER PILLAR 1 (W9920), BROOKFIELD PARK, MANVERS WAY, WATH-UPON-DEARNE, ROTHERHAM, S63 5DJ (2 components)

2MW of demand reduction

DSR LIMEJUMP LTD Unproven DSR CMU
Inactive β€’ 2022-23 (T-4), 2019-20 (T-1)
1.69 MW
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
β€’ 0.250MW Battery Energy Storage System
β€’ 0.25MW of Demand Reduction
β€’ 5MW of demand reduction
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU
Active β€’ 2025-26 (T-4), 2024-25 (T-4) ...
7.09 MW
Loading map...
Showing 5 locations