CMU Castle

15 unique locations - 3.4MW total capacity

Allington EfW, Laverstoke Road, 20/20 Business Park, Allington, Maidstone, Kent, ME16 0LE (25 components)
• Demand reduction
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• This CMU identifier is the replacement of ALL001 due to changes of unit capacity and connection agreement. The connection capacity is based on historic data as per rule 3.5.3 Allington Integrated Waste Management Facility,500kT Energy from Waste Plant with c. 36MW electrical output. The auxiliary load is not included in the connection capacity i.e. The export is net. There are 2 different MPAN 1900070394446 and 1900070467983, accumulating to the total output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
164.37 MW
Brakes - Tamworth, Bonehill Road, TAMWORTH, Staffordshire B78 3HJ (21 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
7.23 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (35 components)
• A 7.5MW Tesla Battery Energy Storage System
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2098.53 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (33 components)
• EV charge station
• Heysham 1 Power Station CMU 1: [HY1124] T_HEYM11
• Heysham 1 Power Station CMU 2: [HY1224] T_HEYM12
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2591.79 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (19 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU will be formed of multiple individual diesel reciprocating generating units controlled centrally and exporting to the distribution system.
• West Burton B Power Station CMU 2 WB2-20= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (44 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
Active • 2028-29 (T-4), 2027-28 (T-4) ...
112.29 MW
Maesgwyn Farm, Chirk, Wrexham, LL14 5NT (24 components)

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

Active • 2028-29 (T-4), 2026-27 (T-4) ...
200.27 MW
Millerhill Recycling & Energy Recovery Centre Whitehill Road DALKEITH EH22 1SX (11 components)
• FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• FCC (E+M) Limited, New build 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
• New CMU ID due to updated Grid Connection Agreement FCC (E+M) Limited, 170kT Energy from Waste plant at Newcraighall with estimated 14 MW Generation Capacity. Auxilliary load is not included in connection capacity .i.e the export is net.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
38.59 MW
New Galloway, Castle Douglas, Kirkcudbrightshire, DG7 3SF, Scotland (43 components)
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 1, part of the Galloway hydroelectric scheme. The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
• Glenlee hydro power station - Unit 2, part of the Galloway hydroelectric scheme The registered capacity of the Glenlee hydro power station is 30MVA or 24MW at 0.8PF and each of the 2 identical generating unit components at the station is 12MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
78.70 MW