Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU CES010

5 unique locations - 5.2MW total capacity

Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET (30 components)
• !MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW
• 1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 2.891 MW as per the average of 3 net output peaks.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
13.12 MW
Birmingham Children?s Hospital, Steelhouse Lane, Birmingham, B4 6NH (4 components)

1.6MW Combined Heat and Power Plant at Birmingham Children Hospital

Active • 2025-26 (T-4), 2024-25 (T-4) ...
International Conference Centre, Birmingham, B1 2EA (15 components)
• 1.6MW Combined Heat and Power at International Conference Centre
• 1.6MW Combined Heat and Power at International Conference Centre. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.163 MW as per the average of 3 net output peaks.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6.72 MW
National Indoor Arena, King Edward Road, Birmingham, B1 2AA (15 components)
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 081171171
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602
• Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602. The generator sizes have been inserted pro rata to achieve the overall CMU capacity of 2.037MW as per the average of 3 net output peaks.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2.67 MW
Loading map...
Showing 5 locations