Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU ANC2B2

5 unique locations - 0.3MW total capacity

Drayton Manor Farm, Alcester Road, Stratford-upon-Avon, CV37 9RG (10 components)
β€’ 0.400MW of battery storage located at Stratford-Upon-Avon.
β€’ 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
β€’ 1 x 1MW / 1.2 MWh BYD Lithium Ion Battery: at Drayton Manor Farm,Alcester Road,Stratford-upon-Avon,CV37 9RG
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (10 components)
β€’ 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Heywood Grange,Dilhorne,Staffordshire,ST10 2PL
β€’ 1.000MW of battery storage located at Staffordshire.
β€’ 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
β€’ 1.200MW of battery storage located at Hook.
β€’ 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
β€’ 5.4 MW of battery storage units across different sites
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land North of Clayhill Farm Westoning, MK45 5JD (18 components)
β€’ 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD
β€’ 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
β€’ 6 MW Battery Storage facility located at Westoning.
β€’ ... and 4 more unique descriptions
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
1.31 MW
Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD (8 components)
β€’ 1.200MW of battery storage located at Durham.
β€’ 1.200MW of storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD
β€’ Battery storage located at Low Burntoft, Newton Bewley, Billingham, Durham, TS22 5PD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 settlement periods identified over the previous months, per Capacity Market rules 3.5.3 & 3.5.4.
DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active β€’ 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 5 locations