CMU ANC2B1

12 unique locations - 0.2MW total capacity

Drayton Manor Farm, Alcester Road, Stratford-upon-Avon, CV37 9RG (10 components)
• 0.400MW of battery storage located at Stratford-Upon-Avon.
• 0.400MW of storage located at Drayton Manor Farm, Alcester Road, Stratford-Upon-Avon, CV37 9RG
• 1 x 1MW / 1.2 MWh BYD Lithium Ion Battery: at Drayton Manor Farm,Alcester Road,Stratford-upon-Avon,CV37 9RG
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.19 MW
0.20 MW
Heywood Grange, Dilhorne, Staffordshire, ST10 2PL (10 components)

Battery storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL with a nameplate capacity of 1.000 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

DSR Storage (Duration 1h) LIMEJUMP LTD Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Heywood Grange,Dilhorne,Staffordshire,ST10 2PL (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Heywood Grange,Dilhorne,Staffordshire,ST10 2PL
• 1.000MW of battery storage located at Staffordshire.
• 1.000MW of storage located at Heywood Grange, Dilhorne, Staffordshire, ST10 2PL
DSR Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• 5.4 MW of battery storage units across different sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Hungerford Farm, Winchfield, Hook, RG27 8SW (10 components)

Battery storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU … (3)

DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Land North of Clayhill Farm Westoning MK45 5JD (18 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD
• 1.200MW of storage located at Land North of Clayhill Farm, Westoning MK45 5JD
• 6 MW Battery Storage facility located at Westoning.
DSR Storage Storage (Duration 1h) LIMEJUMP LTD Unproven DSR CMU New Build Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.31 MW
Land North of Clayhill Farm Westoning, MK45 5JD (18 components)

1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Land North of Clayhill Farm Westoning,MK45 5JD (2)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1.31 MW