Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU ANC1A1

14 unique locations - 0.5MW total capacity

Bluehouse Farm, Newton Bewley, Billingham, Durham TS22 5PW (10 components)
• 1.200MW of battery storage located at Durham.
• 1.200MW of storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW
• 5.2MW of batteries across several sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW (10 components)

Battery storage located at Bluehouse Farm, Newton Bewley, Billingham, Durham, TS22 5PW with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing … (3)

DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Carlton, Stockton-on-Tees, TS21 1EA (10 components)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Carlton, Stockton-on-Tees, TS21 1EA (8 components)

Battery storage located at Carlton, Stockton-on-Tees, TS21 1EA with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the Existing Generating CMU over 3 … (3)

DSR Storage (Duration 1h) GSES 1 LIMITED Existing Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Carlton,Stockton-On-Tees,TS21 1EA (10 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Carlton,Stockton-On-Tees,TS21 1EA
• 1.200MW of battery storage located at Stockton-on-Tees.
• 1.200MW of storage located at Carlton, Stockton-on-Tees, TS21 1EA
DSR Storage (Duration 1h) LIMEJUMP LTD New Build Generating CMU
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD
• 1 x 1.2MW / 1.2 MWh BYD Lithium Ion Battery: at Fell View Farm,Preston Road,Grimsargh,Preston,PR2 5SD Separate connection
• 1.200MW of battery storage located at Preston.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
0.40 MW
Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD (20 components)

Battery storage located at Fell View Farm, Preston Road, Grimsargh, Preston, PR2 5SD with a nameplate capacity of 1.200 MW. Connection capacity is calculated as the Average Output of the … (3)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.40 MW
Hungerford Farm, Winchfield, Hook RG27 8SW (10 components)
• 1.200MW of battery storage located at Hook.
• 1.200MW of storage located at Hungerford Farm, Winchfield, Hook, RG27 8SW
• 5.4 MW of battery storage units across different sites
Active • 2028-29 (T-4), 2027-28 (T-4) ...
0.20 MW
Loading map...
Showing 10 locations