Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

CMU 23PER4

2 unique locations - 9.1MW total capacity

Persley Croft, The Parkway, Aberdeen AB22 8AN (2 components)
β€’ CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN
β€’ The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; ? 1No. 33 kilovolt (Kv) operator substation (23m x 7.4m x 4.45m); ? 1No. 33Kv distribution network operator (DNO) substation to facilitate network connection (8.7m x 5.7m x 3.5m); ? Office accommodation and welfare facilities (12.2m x 2.4m x 2.59m)
Active β€’ 2028-29 (T-4), 2027-28 (T-4)
28.88 MW
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

Active β€’ 2028-29 (T-4), 2027-28 (T-4)
28.88 MW
Loading map...
Showing 2 locations