Capacity Market Search

Displaying items 1 - 1 of 1 matching components

Component Results (1)

Sort by: Relevance Location Date
Sorted by Relevance

DEBUG: Template sees CMU ID: BBM-18 | DB ID: 8161

Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …

E.ON UK CHP LIMITED CMU: BBM-18 Storage (Duration 0.5h) Capacity N/A 2019-20 (T-1) One Year Ahead Capacity Auction