Capacity Market Search

Showing components with technology: Storage (Duration 9h)

Displaying items 1 - 33 of 33 matching components

Component Results (33)

DEBUG: Template sees CMU ID: FOYE-1 | DB ID: 10328

Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 1

SSE Generation Limited CMU: FOYE-1 Storage (Duration 9h) 139.49 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: FOYE-2 | DB ID: 10339

Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 2

SSE Generation Limited CMU: FOYE-2 Storage (Duration 9h) 139.49 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-3 | DB ID: 10075

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-3 Storage (Duration 9h) 279.31 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-4 | DB ID: 10086

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) 282.63 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-4 | DB ID: 10087

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) 279.16 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-4 | DB ID: 10102

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) 280.21 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: D1_244 | DB ID: 45565

Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL

Grid Scale Battery Energy Storage.

DEESIDE POWER (UK) LIMITED CMU: D1_244 Storage (Duration 9h) 7.25 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-4 | DB ID: 10103

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-4 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) 284.27 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: FOYE-1 | DB ID: 10322

Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 1

SSE Generation Limited CMU: FOYE-1 Storage (Duration 9h) 141.56 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBB23 | DB ID: 45120

Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBB23 Storage (Duration 9h) 6.04 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPNP23 | DB ID: 45125

Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPNP23 Storage (Duration 9h) 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPNY23 | DB ID: 45126

Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

ASHGREEN ENERGYFARM LIMITED CMU: PPNY23 Storage (Duration 9h) 7.25 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPSL23 | DB ID: 45127

Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPSL23 Storage (Duration 9h) 5.68 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: THOR-4 | DB ID: 43080

Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter)

BESS project to be installed within a future Greener Grid Park.

BALWEN LIMITED CMU: THOR-4 Storage (Duration 9h) 31.13 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: COWLEY | DB ID: 43999

Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

COWLEY BALDON GREEN LIMITED CMU: COWLEY Storage (Duration 9h) 3.49 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WALPOL | DB ID: 44508

Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA

CMU ID 23KIN4, a new build battery storage CMU

WALPOLE GREEN LIMITED CMU: WALPOL Storage (Duration 9h) 15.35 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: 23DRU4 | DB ID: 44552

Land At Drum Farm Keith Moray AB55 5NP

Battery storage CMU

FIELD DRUM FARM LTD CMU: 23DRU4 Storage (Duration 9h) 9.06 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: 23HOL4 | DB ID: 44553

Land To East Of Holmston Roundabout A77T From Whitletts Roundabout To Holmston Roundabout, Ayr, South Ayrshire

Battery storage CMU

FIELD HOLMSTON LTD CMU: 23HOL4 Storage (Duration 9h) 9.06 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: 23PER4 | DB ID: 44554

Persley Croft, The Parkway, Aberdeen AB22 8AN

CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN

PERSLEY CROFT BESS LTD CMU: 23PER4 Storage (Duration 9h) 9.09 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: MELKSH | DB ID: 44296

LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ.

Lithium-based battery energy storage system.

MELKSHAM CALNE GREEN LIMITED CMU: MELKSH Storage (Duration 9h) 7.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-3 | DB ID: 10074

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-3 Storage (Duration 9h) 283.77 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-4 | DB ID: 10089

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-5 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) 283.30 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PITK27 | DB ID: 45108

Pikevy Farm, Glenrothes, Fife, KY6 3HD

This is a 49.9MW battery storage facility connected at 33kV.

PITKEVEY BATTERY STORAGE LIMITED CMU: PITK27 Storage (Duration 9h) 7.90 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPBT23 | DB ID: 45121

Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPBT23 Storage (Duration 9h) 7.91 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPKM23 | DB ID: 45122

Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPKM23 Storage (Duration 9h) 3.49 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: PPLD23 | DB ID: 45123

Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP CMU: PPLD23 Storage (Duration 9h) 6.50 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: NINB-1 | DB ID: 45066

Land South West of Ninfield Substation, Kilnwood Farm, Potmans Lane, Bexhill on Sea, East Sussex, TN39 5JL

New build BESS

STATKRAFT UK LTD CMU: NINB-1 Storage (Duration 9h) 19.46 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: BB_234 | DB ID: 44601

Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF

Standalone battery storage system connecting at 33kV to the Broxburn substation

BROXBURN ENERGY STORAGE LIMITED CMU: BB_234 Storage (Duration 9h) 6.58 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CK_234 | DB ID: 44730

High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY

Standalone battery storage system connecting at 33kV to the East Killbride substation

CATHKIN ENERGY STORAGE LIMITED CMU: CK_234 Storage (Duration 9h) 6.58 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: 23ROC4 | DB ID: 44563

Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT

Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …

ROCHDALE (BES) LTD CMU: 23ROC4 Storage (Duration 9h) 8.82 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: FECB-1 | DB ID: 44928

Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP

New build BESS to be installed within a future Greener Grid Park.

LOGI ENERGY LIMITED CMU: FECB-1 Storage (Duration 9h) 11.32 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: FOYE-2 | DB ID: 10332

Foyers Power Station, Foyers, Inverness, IV2 6YB

Generating Unit 2

SSE Generation Limited CMU: FOYE-2 Storage (Duration 9h) 141.56 MW 2027-28 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: DINO-4 | DB ID: 10088

Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY

BM unit T_DINO-6 at Dinorwig Power Station (Pumped Storage)

First Hydro Company CMU: DINO-4 Storage (Duration 9h) 286.85 MW 2027-28 (T-4) Four Year Ahead Capacity Auction