Capacity Market Search

Showing components with technology: Combined Heat and Power (CHP)

Displaying items 1 - 50 of 2143 matching components (Page 1 of 43)

Component Results (2143)

DEBUG: Template sees CMU ID: GB2502 | DB ID: 46376

96 Kings Rd, Immingham DN40 1QS

New-Build CHP Generating Unit at Knauf (UK) Immingham Plant.

GRIDBEYOND LIMITED CMU: GB2502 Combined Heat and Power (CHP) 3.23 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD009 | DB ID: 13141

Maesgwyn Farm, Chirk, Wrexham, LL14 5NT

On-site CHP - existing generating unit Maesgwyn Farm, Chirk, Wrexham, LL14 5NT SJ 284 383

GRIDBEYOND LIMITED CMU: GBD009 Combined Heat and Power (CHP) 30.97 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2401 | DB ID: 32590

Mettis Aerospace Limited, Redditch Works, Windsor Road, Redditch, Worcestershire, B97 6EF

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GB2401 Combined Heat and Power (CHP) 2.64 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2521 | DB ID: 46379

Caernarfon Brick Works, Seiont Mill Road, Caernarfon, LL55 2YL

New-Build CHP Generating Unit at Seoint Quarry, Caernarfon.

GRIDBEYOND LIMITED CMU: GB2521 Combined Heat and Power (CHP) 18.19 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2532 | DB ID: 41769

Young's House, Wickham Road, Grimsby DN32 8HW

On-site Generating CMU

GRIDBEYOND LIMITED CMU: GB2532 Combined Heat and Power (CHP) 1.36 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2401 | DB ID: 32589

Lindum Mill, Ashby Road, Shepshed, Leicestershire, LE12 9BS

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GB2401 Combined Heat and Power (CHP) 1.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2501 | DB ID: 32739

Chryston, Moodiesburn, Glasgow G69 0JE

On-site Generating CMU.

GRIDBEYOND LIMITED CMU: GB2501 Combined Heat and Power (CHP) 1.64 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD020 | DB ID: 32756

Telford Dairy Limited, Donnington Wood Business Park, Telford, Shropshire, TF2 7GJ

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GBD020 Combined Heat and Power (CHP) 1.27 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD020 | DB ID: 32753

Lake Rd, Trafford Park, Stretford, Manchester M17 1TU, United Kingdom

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GBD020 Combined Heat and Power (CHP) 2.08 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD020 | DB ID: 32754

Muller Milk & Ingredients Ltd, Stonebridge Cross, Hampton Lovett, Droitwich, WR9 0NX

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GBD020 Combined Heat and Power (CHP) 4.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD020 | DB ID: 32755

Muller UK Limited, Tern Valley Business Park, Market Drayton, Shropshire, TF9 3SQ

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GBD020 Combined Heat and Power (CHP) 4.09 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2531 | DB ID: 41767

Hugden Way, Malton YO17 9HG

On-site Generating Unit.

GRIDBEYOND LIMITED CMU: GB2531 Combined Heat and Power (CHP) 2.18 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD013 | DB ID: 17563

Samworth Brothers, 81-83 Tavistock Road, Callington, Cornwall, PL17 7TA

Callington - Existing Site CHP unit

GRIDBEYOND LIMITED CMU: GBD013 Combined Heat and Power (CHP) 2.40 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GBD011 | DB ID: 24934

Aspatria Creamery/Station Rd, Wigton CA7 2AR

Existing Generation on existing site - CHP

GRIDBEYOND LIMITED CMU: GBD011 Combined Heat and Power (CHP) 1.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GB2405 | DB ID: 32598

Nufarm Wyke Lane, Wyke, Bradford, West Yorkshire, BD12 9EJ

On-Site Generating CMU

GRIDBEYOND LIMITED CMU: GB2405 Combined Heat and Power (CHP) 3.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GRAI-6 | DB ID: 6152

Power Station Road Isle of Grain Rochester ME3 0AR

Grain B CCGT Unit 6 Grain B power station provides heat to the Grain LNG regasification facility.

Uniper Global Commodities SE CMU: GRAI-6 Combined Heat and Power (CHP) 425.65 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: GRAI-8 | DB ID: 6168

Power Station Road Isle of Grain Rochester ME3 0AR

Grain B CCGT Unit 8. Grain B power station provides heat to the Grain LNG regasification facility.

Uniper Global Commodities SE CMU: GRAI-8 Combined Heat and Power (CHP) 425.65 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7767

Monkerton Energy Centre, Tithebarn Lane, Exeter, Devon, EX1 3RH

A gas engine CHP site providing hot water to a local district heating network

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 1.44 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7771

Cannon Wharf CHP, Yeoman Street, London, SE8 5DT

A gas engine CHP site providing hot water to a local district heating network

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 0.17 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7773

Drayton Garden Village CHP, Porters Way, Hillingdon, Greater London, UB7 9AA

A gas engine CHP site providing hot water to a local district heating network

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 0.27 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7774

Maple Quay CHP, Montreal House, Surrey Quay Road, Rotherhithe, London, SE16 7AP

A gas engine CHP site providing hot water to a local district heating network

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 0.19 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7781

WEMBLEY ENERGY CENTRE, HARBUTT ROAD, OFF ENGINEERS WAY, WEMBLEY, LONDON, HA9 0NH

A gas engine CHP site providing hot water to a local district heating network

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 0.78 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F24011 | DB ID: 45661

Tower Nurseries Netherhall Road Roydon Essex CM19 5JP

Gas engines in commercial horticultural environment with no auxilliary load. All generation unit capacities are nominal and allow for site-specific variations

FLEXITRICITY LIMITED CMU: F24011 Combined Heat and Power (CHP) 2.72 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CarGe8 | DB ID: 45562

Cargill PLC, Trafford Park, Manchester, M17 1PA

Solar T70 based CHP system

CARGILL PLC CMU: CarGe8 Combined Heat and Power (CHP) 7.26 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: BSBU25 | DB ID: 45410

Bury St Edmunds Sugar Factory British Sugar plc Hollow Road Bury St Edmunds IP32 7BB

The CMU is a gas fired CCGT CHP

BRITISH SUGAR PLC CMU: BSBU25 Combined Heat and Power (CHP) 55.34 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CEN024 | DB ID: 45516

Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF

A gas engine CHP site providing electricity & heat to the associated development

E.ON UK PLC CMU: CEN024 Combined Heat and Power (CHP) 0.00 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: CEN024 | DB ID: 45517

Energy Centre Westfield London, Ariel Way, White City, London, W12 7GF

A gas engine CHP site providing electricity & heat to the associated development

E.ON UK PLC CMU: CEN024 Combined Heat and Power (CHP) 0.84 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7783

Cranbrook CHP2, Honiton Road, Cranbrook, Exeter, EX5 2DX

A gas engine CHP site providing hot water to a local district heating network, as well as a solar PV installation on site but is metered seperately to the CHP

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 1.39 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: WATERS | DB ID: 7821

Elephant Park Energy Centre, Rodney Road, London, SE17 1FJ

A site with two gas engine CHPs, providing hot water to a local district heating network

Waterswallows Energy Limited CMU: WATERS Combined Heat and Power (CHP) 0.67 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F18024 | DB ID: 8604

Montgomery Road, Aberdeen AB24 2YA

District heating implementation with one asset 0.996MW exporting excess to distribution network, Primary fuel type = Natural Gas. All generation unit capacities are nominal and allow for site-specific variations.

FLEXITRICITY LIMITED CMU: F18024 Combined Heat and Power (CHP) 0.86 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F20111 | DB ID: 15194

Rotherdale Farm, Long Lane, Throckmorton, Worcestershire, United Kingdom, WR10 2JH

One of three CHP in a horticultural environment

FLEXITRICITY LIMITED CMU: F20111 Combined Heat and Power (CHP) 2.77 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F19004 | DB ID: 22150

Plot 4 Thanet Earth, Barrow Man Road Birchington Kent CT7 0AX

Two CHP gas engines in commercial horticultural environment with no auxilliary load

FLEXITRICITY LIMITED CMU: F19004 Combined Heat and Power (CHP) 5.96 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F21018 | DB ID: 22216

Northmoor Lane, Cottingham, Hull HU16 4JN

one CHP (1.9MW rating) in a horticulatural environment with no aux load

FLEXITRICITY LIMITED CMU: F21018 Combined Heat and Power (CHP) 1.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F20002 | DB ID: 41002

Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX

CHP engine in horticultural environment with no auxilliary load

FLEXITRICITY LIMITED CMU: F20002 Combined Heat and Power (CHP) 2.58 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: BDEC01 | DB ID: 41570

Aston University, Aston Triangle, Birmingham, West Midlands, B4 7ET

1MW Combined heat and Power Plant at Aston University. Total Capacity is 3.000MW, consisting of two generators - 2.000MW and 1.000MW

BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CMU: BDEC01 Combined Heat and Power (CHP) 0.91 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: BDEC02 | DB ID: 41575

National Indoor Arena, King Edward Road, Birmingham, B1 2AA

Auxiliary supply is subtracted prior to Bespoke Metering point MSID - NIA M1 ? 18042602

BIRMINGHAM DISTRICT ENERGY COMPANY LIMITED CMU: BDEC02 Combined Heat and Power (CHP) 0.53 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: ELES01 | DB ID: 41631

100 Montifichet Road, Westfield, Stratford E20 1GR

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

EAST LONDON ENERGY LIMITED CMU: ELES01 Combined Heat and Power (CHP) 2.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: ELES01 | DB ID: 41632

100 Montifichet Road, Westfield, Stratford E20 1GR

Combined Heat and Power Plant Stratford made up of 2 generators totalling 6.6MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 5.838 …

EAST LONDON ENERGY LIMITED CMU: ELES01 Combined Heat and Power (CHP) 2.81 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: EXC001 | DB ID: 41693

Excel Energy Centre Warehouse R Royal Victoria Dock Northside London E16 1BA

1.2 MW Combined Heat and Power Engine.

EXCEL DISTRICT ENERGY COMPANY LIMITED CMU: EXC001 Combined Heat and Power (CHP) 1.46 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: LDEC01 | DB ID: 41877

St Marks Boilerhouse Donaldson Road LEICESTER Leicestershire LE4 6BF

Combined Heat and Power Plant, St Marks Boiler House, capacity of generator 1.600MW. Although the supplier of the settled hh meter has provided their three peaks, we have used the …

LEICESTER DISTRICT ENERGY COMPANY LIMITED CMU: LDEC01 Combined Heat and Power (CHP) 1.35 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: LISH01 | DB ID: 42852

Lister Hospital, Coreys Mill Lane, Stevenage, Hertfordshire, SG1 4AB

1 x Gas reciprocating engine with a total rated gross power capacity of 1.400 MW and a net power capacity of 1.374 MW after considering the generator auxiliary load.

VEOLIA UK LIMITED CMU: LISH01 Combined Heat and Power (CHP) 1.23 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SPOND1 | DB ID: 43067

Ormskirk and District General Hospital, Wigan Road, Ormskirk, Lancashire, L39 2AZ

1 x gas reciprocating engine with a total rated gross power capacity of 0.900 MW and a net power capacity of 0.869 MW

VEOLIA UK LIMITED CMU: SPOND1 Combined Heat and Power (CHP) 0.73 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: S26G02 | DB ID: 44381

Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom

CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S26G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.

Sembcorp Utilities (UK) Limited CMU: S26G02 Combined Heat and Power (CHP) 38.65 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SGH008 | DB ID: 43057

Southampton General Hospital Tremona Road, Southampton, SO16 6YD

2X gas reciprocating engines with a total gross power capacity of 3.973 MW

VEOLIA UK LIMITED CMU: SGH008 Combined Heat and Power (CHP) 3.59 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SPOND1 | DB ID: 43066

Estates & Facilities, North Devon District Hospital, Raleigh Park, Barnstaple, EX31 4JB

1 x gas reciprocating engine with a total rated gross power capacity of 0.800 MW

VEOLIA UK LIMITED CMU: SPOND1 Combined Heat and Power (CHP) 0.72 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: SPOND1 | DB ID: 43068

Southport & Formby District General Hospital, Town Lane Kew, Southport PR8 6PN

1 x gas reciprocating engine with a total rated gross power capacity of 0.995 MW and a net power capacity of 0.961 MW

VEOLIA UK LIMITED CMU: SPOND1 Combined Heat and Power (CHP) 0.86 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: UHB001 | DB ID: 43138

Good Hope Hospital, Rectory Road, Sutton Coldfield, West Midlands, B75 7RR

1 x gas engine with a total rated gross power capacity of 1.166 MW.

VEOLIA UK LIMITED CMU: UHB001 Combined Heat and Power (CHP) 1.06 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: UHB001 | DB ID: 43139

Heartland Hospital, Bordesley Green E, Birmingham, B9 5SS

1 x gas engine with a total rated gross power capacity of 1.519MW

VEOLIA UK LIMITED CMU: UHB001 Combined Heat and Power (CHP) 1.34 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: UNL001 | DB ID: 43141

Lever House, Wood Street, Port Sunlight Wirral, CH42 4XN

2x reciprocating gas engines with an aggregate gross capacity of 3.996 MW and net capacity of 3.908 MW

VEOLIA UK LIMITED CMU: UNL001 Combined Heat and Power (CHP) 3.55 MW 2028-29 (T-4) Four Year Ahead Capacity Auction

DEBUG: Template sees CMU ID: F21144 | DB ID: 43558

Westland Nurseries (Offenham) Ltd., Station Road, Offenham, Evesham, Worcestershire, WR11 8LW

One asset 1.5MW CHP engine in a horticultural environment with no auxiliary load.

FLEXITRICITY LIMITED CMU: F21144 Combined Heat and Power (CHP) 0.91 MW 2028-29 (T-4) Four Year Ahead Capacity Auction