A Battery Energy Storage System
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active -
2024-25 (T-4)
-
• 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales.
(2)
-
• 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
Battery Storage Plant
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
49.5MW Battery Energy Storage System
Active -
2024-25 (T-4)
A Battery Energy Storage System.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
49.900 Storage unit
Active -
2024-25 (T-4)
Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
A Battery Energy Storage System
(2)
Inactive -
2024-25 (T-4),
2022-23 (T-1)
The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 …
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active -
2024-25 (T-4)
-
• 10MW of onshore wind generation
-
• 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
-
• 49.900MW storage installation
Active -
2024-25 (T-4)
4 x 2.5MW and 1 x 0.8MW BESS units installed on the site
Active -
2024-25 (T-4)
-
• Battery Energy storage linked to solar farm
(2)
-
• Solar farm
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-1)
(and 1 more)
The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …
Active -
2024-25 (T-4)
1x 2.000MW 1 hour Energy Storage System
Active -
2024-25 (T-4)
A new battery storage plant, with associated civil works, switchgear and electrical connection.
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
-
• A Battery Energy Storage System
-
• A Battery Energy Storage System.
-
• A New Build Gas fuelled power plant
Active -
2025-26 (T-4),
2024-25 (T-4)
49.9MW Battery Storage facility located at Capenhurst GSP
Active -
2024-25 (T-4)
Battery Storage Plant
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
(3)
Inactive -
2024-25 (T-4),
2022-23 (T-4),
2021-22 (T-4)
-
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
(2)
-
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 1 more)
A Battery Energy Storage System.
(2)
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
-
• 1.200MW Battery Energy Storage System
(2)
-
• 1.200 MW of demand reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Active -
2024-25 (T-4)
-
• 1.200MW Battery Energy Storage System
(2)
-
• 1.2 MW of demand reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active -
2024-25 (T-4)
-
• A new build 30MW battery energy storage system
(2)
-
• A new build 29MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
Battery Storage Plant
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A New Build Battery Energy Storage System
(2)
-
• A New Build Gas fuelled power plant at Capenhurst substation
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 2 more)
-
• A Battery Energy Storage System
(2)
-
• A Battery Energy Storage System, which has already PQ'd as POTM25
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Battery storage
(2)
-
• Battery strorage unit
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-3)
(and 2 more)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
Battery Storage Plant
(3)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• A new build 20MW battery energy storage system
(2)
-
• A new build 19MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
1.500MW Battery Energy Storage System
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-1)
(and 1 more)
Battery storage
Active -
2024-25 (T-4)
-
• A Battery Energy Storage System.
(2)
-
• 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2023-24 (T-1)
(and 2 more)
-
• A Battery Energy Storage System.
(2)
-
• A New Build Gas fuelled power plant.
Active -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 2 more)
-
• 0.500MW Battery Energy Storage System
(2)
-
• 0.5MW of demand reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 1 more)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
Active -
2024-25 (T-4)
0.800MW Battery Energy Storage System
(2)
Active -
2025-26 (T-4),
2024-25 (T-4)
12MW Battery Storage located at Brindley Close in Swindon
Active -
2024-25 (T-4)
-
• A 49.5MW battery energy storage system
(2)
-
• A 48MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
-
• 0.250MW Battery Energy Storage System
(2)
-
• 0.25MW of Demand Reduction
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 2 more)
Battery storage unit
(2)
Inactive -
2024-25 (T-4),
2021-22 (T-1)
A new build 11MW battery storage system
(3)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 2 more)
The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.
Active -
2024-25 (T-4)