Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage

126 unique locations 64 components 0 companies Page 1 of 3
Map View
Gipsy Lane, A664, Rochdale, OL11 3HA (3 components)

A Battery Energy Storage System (3)

ARL 001 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Rhyd y Groes Rhosgoch Anglesey, Wales LL66 0AT (7 components)
  • • 1 x 49.99 MW distribution connected battery storage plant located on agricultural land on the island of Anglesey, north Wales. (2)
  • • 1 x 49.99 MW distribution connected photovoltaic plant located on agricultural land on the island of Anglesey, north Wales.
PORTH WEN SOLAR LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (3 components)

A Battery Energy Storage System. (3)

SW MANNINGTON LIMITED Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Longridge Road, Preston, Lancashire PR2 5NQ (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

STOR 101 LTD Storage Reciprocating engines OCGT and Reciprocating Engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
Mannington Depot, Telford Way, Swindon, SN5 8BA (2 components)

A Battery Energy Storage System (2)

SW MANNINGTON LIMITED Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2022-23 (T-1)
Meadowcroft Farm, Gretton Fields, Gretton, GL54 5HJ (5 components)

The CMU component at Meadowcroft Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 5 MW export capacity and an import capacity of 5 … (3)

GHEB2 C1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Active - 2024-25 (T-4)
60-70 Reach Road Burwell CB25 0AH (3 components)
  • • 10MW of onshore wind generation
  • • 40MW of solar generation covering lower Portland Farm and land off Newnam Drove.
  • • 49.900MW storage installation
East Anglia Grid Storage One Limited Onshore Wind Solar Photovoltaic Storage (Duration 1h)
Active - 2024-25 (T-4)
Great Wheatley Road Rayleigh SS6 7AR (1 components)

4 x 2.5MW and 1 x 0.8MW BESS units installed on the site

WEIRS DROVE DEVELOPMENT LIMITED Storage (Duration 1h)
Active - 2024-25 (T-4)
Bilton Farm, Preston Road, Hull, HU11 4DZ (8 components)
  • • Battery Energy storage linked to solar farm (2)
  • • Solar farm
WARRINGTON RENEWABLES (HULL) LIMITED Solar Photovoltaic Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1) (and 1 more)
Unit 12, Gateway Crescent, Oldham, Lancashire, OL9 9XB. (1 components)

The CMU comprises of Lithium Ion batteries (1-hour duration) to be installed within an existing warehouse. The batteries will be installed in standard CATL modules with an internal racked system …

FIELD OLDHAM LTD Storage (Duration 1h)
Active - 2024-25 (T-4)
Forest Lane, Alne, York, YO61 1TU (1 components)

1x 2.000MW 1 hour Energy Storage System

LIMEJUMP LTD Storage (Duration 1h)
Active - 2024-25 (T-4)
Thames Water Sewage Works Amersham Road Denham Buckinghamshire SL9 7AW (3 components)

A new battery storage plant, with associated civil works, switchgear and electrical connection. (2)

Field Gerrards Cross Ltd Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
  • • A Battery Energy Storage System
  • • A Battery Energy Storage System.
  • • A New Build Gas fuelled power plant
HD777FRY LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4)
Land next to Capenhurst substation, Ledsham, Ellesmere Port, CH66 2HD (1 components)

49.9MW Battery Storage facility located at Capenhurst GSP

Zenobe Capenhurst Limited Storage (Duration 1h)
Active - 2024-25 (T-4)
Hawthorne Road, Bootle, Merseyside, L20 5AG. (3 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters. (3)

Shaw-Energi Ltd Storage Storage (Duration 1h) Storage (Duration 0.5h)
Inactive - 2024-25 (T-4), 2022-23 (T-4), 2021-22 (T-4)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (39 components)
  • • BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage) (2)
  • • BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
First Hydro Company Storage Storage (Duration 4.5h) Storage (Duration 5.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
The Common, Malmesbury, Wiltshire, SN16 9RJ (10 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Church Bottom - Connection offer is for …
BRK 001 Limited Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (2)
  • • 1.200 MW of demand reduction
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, Scotland, ML2 0EF, United Kingdom (2 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV

Zenobe Wishaw Limited Storage (Duration 1h)
Active - 2024-25 (T-4)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (2)
  • • 1.2 MW of demand reduction
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (2)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
  • • A New Build Battery Energy Storage System (2)
  • • A New Build Gas fuelled power plant at Capenhurst substation
HD888CAP LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
Potman's Lane, Battle, TN33 9BL (5 components)
  • • A Battery Energy Storage System (2)
  • • A Battery Energy Storage System, which has already PQ'd as POTM25
BRK 002 LIMITED Storage (Duration 1h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 1 more)
Maidenhead Road, Windsor, SL4 5GD (8 components)
  • • Battery storage (2)
  • • Battery strorage unit
CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 2 more)
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD143OCK LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
  • • A new build 20MW battery energy storage system (2)
  • • A new build 19MW battery energy storage system
HARMONY FM LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Safran Landing Systems Services UK Ltd, Safran MRO UK, METEOR BUSINESS PARK, CHELTENHAM ROAD EAST, GLOUCESTER, GLOUCESTERSHIRE, GL2 9QL (5 components)

1.500MW Battery Energy Storage System (3)

LIMEJUMP LTD Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-1) (and 1 more)
Back Lane, Chesterfield, S44 5XQ (8 components)
  • • A Battery Energy Storage System. (2)
  • • 10 x 1mw Battery Storage units to be installed on designated land at Back Lane - Connection offer is for …
ARL 027 LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2023-24 (T-1) (and 2 more)
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD144WHI LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (3)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 2 more)
PROJECT SCENE ENERGY CENTRE, TRENT BASIN, TRENT LANE, SNEINTON, NOTTINGHAM, NOTTINGHAMSHIRE, NG2 4DS (4 components)
  • • 0.500MW Battery Energy Storage System (2)
  • • 0.5MW of demand reduction
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 1 more)
Carnegie Road, Liverpool L13 7HY (1 components)

The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.

Shaw-Energi Ltd Storage (Duration 1h)
Active - 2024-25 (T-4)
Bulls Head Farm Eakley Lanes Goldington Newport Pagnell Buckinghamshire MK16 8LP (2 components)

0.800MW Battery Energy Storage System (2)

LIMEJUMP LTD Storage (Duration 1h)
Active - 2025-26 (T-4), 2024-25 (T-4)
Brindley Close, Cheney Manor, Swindon, SN2 2YW (1 components)

12MW Battery Storage located at Brindley Close in Swindon

Zenobe Brindley Limited Storage (Duration 1h)
Active - 2024-25 (T-4)
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
  • • A 49.5MW battery energy storage system (2)
  • • A 48MW battery energy storage system
HARMONY (PW) LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Church Hill Rd, Middleton-on-the-Wolds, Driffield YO25 9UG (6 components)
  • • 0.250MW Battery Energy Storage System (2)
  • • 0.25MW of Demand Reduction
LIMEJUMP LTD DSR Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Millstream, Maidenhead Road, Windsor, SL45GD (2 components)

Battery storage unit (2)

CENTRICA BUSINESS SOLUTIONS UK LIMITED Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)

A new build 11MW battery storage system (3)

HARMONY BD LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 2 more)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Active - 2024-25 (T-4)
Showing locations 1 - 50 of 126