Storage

70 unique locations 106 components 0 companies Page 1 of 2
Map View
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (32 components)
  • • Unit 1 Cruachan pumped storage hydro plant (7)
  • • Unit 2 Cruachan pumped storage hydro plant (7)
  • • Unit 4 Cruachan pump storage hydro plant (6)
  • • ... and 5 more unique descriptions
DRAX PUMPED STORAGE LIMITED Storage Storage (Duration 12h)
870.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (10 components)
  • • A New Build battery energy storage system. (3)
  • • An existing battery energy storage system.
  • • The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
DEVCO 2017 LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
20.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Land off Sundridge Hill, Cuxton, Rochester, ME2 1LB. (9 components)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of … (4)
  • • The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
RNA-Energy Ltd Storage Storage (Duration 1h)
4.5 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 6 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Mill Farm Caythorpe Heath Ln Caythorpe Grantham NG32 3ER (13 components)
  • • 7 MW of Battery Storage located at Grantham. (3)
  • • Battery Storage located at Grantham. (2)
Limejump Virtual 1 Limited Storage Storage (Duration 1h)
1.7 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
  • • 5MW, 1 hour/5MWh lithium-ion battery (4)
  • • Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
BRAINTREE ELECTRIC FORECOURT LTD Storage Storage (Duration 1h)
0.9 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 5 more)
Stevens Croft Power Station, Johnstonbridge Road, Lockerbie, Dumfries & Galloway. DG11 2SQ (2 components)

A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. … (2)

E.ON UK CHP LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land Adj To Electricity Sub Station Hiillhouse International Works Central Road Thornton-Cleveleys Lancashire, FY5 4QD (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

HILLHOUSE BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land at Bankhead Farm South of Twentyfive Acre Wood, Fishcross, Clackmannanshire, FK10 3HZ (9 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

FISHCROSS BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 26 LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Land at Boscar Grange Farm, Thirsk Road, Easingwold, York, YO61 3NQ (3 components)
  • • A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer … (2)
  • • A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
ENERGY STORE 6 LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

KIWI POWER LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-1) (and 2 more)
Land to the North of Great Wheatley Road, Rayleigh, SS6 7AR (3 components)

The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each. (3)

SOUTH EAST GRID STORAGE TWO LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
land adj West Melton Electricity substation Elsecar Road Brampton Bierlow, S63 6AG (3 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (3)

WEST MELTON BATTERY STORAGE LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2018-19 (T-1)
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (4 components)
  • • The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to … (2)
  • • The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
SPECTRUMRESERVE5 LTD Storage Reciprocating engines
Inactive - 2022-23 (T-4), 2022-23 (T-3), 2021-22 (T-4) (and 1 more)
Old Gloucester Rd, Alveston, Bristol, UK, BS37 9TU (4 components)

This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network … (4)

Ecotricity Generation Limited Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1) (and 1 more)
ROSSIDE FARM ROSSIDE ULVERSTON LA12 7SE (2 components)

NEW BUILD BATTERY STORAGE STATION (2)

ROSSIDE ENERGY LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Land to the west of Old Forge Dr, Redditch B98 7SY, UK (3 components)

The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each. (3)

RNK Holding Ltd Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2019-20 (T-1)
Thames Water Sewage Treatment Works Ducklington Lane Witney OX28 5JH (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

Waterswallows Energy Limited Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Lochawe, Dalmally. Argyll. PA33 1AN. Scotland (12 components)
  • • Cruachan pump storage hydro plant - Unit 3 (2)
  • • Cruachan pumped storage hydro plant - Unit 2 (2)
  • • Cruachan pump storage hydro plant - Unit 4
DRAX PUMPED STORAGE LIMITED Storage Storage (Duration 12h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 10 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Plot 10 Dunnikier Business Park Midfield Drive Mitchelston Industrial Estate Kirkcaldy Fife KY1 3LW (2 components)

BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity (2)

Sainc Energy Limited Storage Storage (Duration 2h)
Inactive - 2022-23 (T-4), 2021-22 (T-4)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (39 components)
  • • BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage) (3)
  • • BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage) (2)
First Hydro Company Storage Storage (Duration 4.5h) Storage (Duration 5.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 7 more)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Brotherton Weir, Knottingley West Yorkshire WF11 8HR (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.2 MW of demand reduction
  • • The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
Thrybergh Weir Kilnhurst Mexborough South Yorkshire S64 5TJ (7 components)
  • • 1.200MW Battery Energy Storage System (3)
  • • 1.200 MW of demand reduction
  • • The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
LIMEJUMP LTD DSR Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 4 more)
1 Pikelaw Place, West Pimbo, Up Holland, Skelmersdale, WN8 9PP (6 components)

The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 … (4)

GHEB2 A1 Limited Storage Storage (Duration 1h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 3 more)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
  • • A new build 11MW battery storage system (4)
  • • A new build 10MW battery storage system
HARMONY BD LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Longridge Road, Preston, Lancashire PR2 5NQ (6 components)
  • • Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)
  • • Battery Storage Facility
  • • Energy facility comprising of reciprocating engine sets.
STOR 101 LTD Storage Reciprocating engines OCGT and Reciprocating Engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
Meek Street, Royton, Oldham, Lancashire OL2 6HL (6 components)
  • • Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)
  • • Battery Storage Facility
  • • Energy facility comprising of reciprocating engine sets.
STOR 126 LTD Storage Reciprocating engines OCGT and Reciprocating Engines
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 2 more)
Showing locations 1 - 50 of 70