• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
-
• ... and 1 more unique descriptions
2549.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Unit 1 Cruachan pumped storage hydro plant
(7)
-
• Unit 2 Cruachan pumped storage hydro plant
(7)
-
• Unit 4 Cruachan pump storage hydro plant
(6)
-
• ... and 5 more unique descriptions
870.3 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 8 more)
-
• A New Build battery energy storage system.
(3)
-
• An existing battery energy storage system.
-
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy …
20.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build battery energy storage system
17.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
-
• A new build 34MW battery energy storage system
(2)
-
• A new build 34MW battery energy storage system commissioned in July 2021
(2)
-
• A new build 32MW battery energy storage system
12.6 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 4 more)
Battery Storage Plant
(5)
9.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
-
• Existing 25 MW storage site using Lithium Ion Batteries
(3)
-
• 25 MW storage site using Lithium Ion Batteries
(2)
7.3 MW
Inactive -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
(and 7 more)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
(4)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
-
• A 7.5MW Tesla Battery Energy Storage System
(4)
-
• Tesla Battery Energy Storage System
2.5 MW
Inactive -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 7 more)
-
• 7 MW of Battery Storage located at Grantham.
(3)
-
• Battery Storage located at Grantham.
(2)
1.7 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 5MW, 1 hour/5MWh lithium-ion battery
(4)
-
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
0.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 5 more)
A site with a 10MW, 10MWh (1C) Lithium Ion Battery system, the system will be connected to the distribution network via the same connection as a nearby biomass power station. …
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
A new power plant, with associated civil works, switchgear and electrical connection.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
-
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
(2)
-
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
2MW BESS
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-1)
(and 2 more)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2018-19 (T-1)
-
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to …
(2)
-
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive -
2022-23 (T-4),
2022-23 (T-3),
2021-22 (T-4)
(and 1 more)
This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
NEW BUILD BATTERY STORAGE STATION
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
Battery Storage Plant
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
A new power plant, with associated civil works, switchgear and electrical connection.
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• Cruachan pump storage hydro plant - Unit 3
(2)
-
• Cruachan pumped storage hydro plant - Unit 2
(2)
-
• Cruachan pump storage hydro plant - Unit 4
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 1 more)
A new power plant, with associated civil works, switchgear and electrical connection.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
BATTERY STORAGE UNIT WITH 13.5 MWh energy supply and 20 MW power capacity
(2)
Inactive -
2022-23 (T-4),
2021-22 (T-4)
-
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
(3)
-
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
49.999 MW pumped storage facility in Gwynedd, North Wales.
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 3 more)
Battery Storage Plant
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 …
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-4)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• Gas Peaking Reciprocating Engine
(4)
-
• Battery Storage Plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
The CMU component at Pikelaw Place is an energy storage system comprised of Lithium-ion batteries. The system will have a 10 MW export capacity and an import capacity of 10 …
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• A new build 11MW battery storage system
(4)
-
• A new build 10MW battery storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 3 more)
-
• A new build 30MW battery energy storage system
(3)
-
• A new build 29MW battery energy storage system
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
-
• Battery Storage Facility
-
• Energy facility comprising of reciprocating engine sets.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
-
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
(3)
-
• Battery Storage Facility
-
• Energy facility comprising of reciprocating engine sets.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)
Battery Storage Plant
(4)
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 2 more)