Storage

16 unique locations 21 components 0 companies Page 1 of 1
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Wearmaster House, Malthouse Lane, Hurstpierpoint, Hassocks, BN6 9LA (11 components)
  • • A new build 34MW battery energy storage system (2)
  • • A new build 34MW battery energy storage system commissioned in July 2021 (2)
  • • A new build 32MW battery energy storage system
HARMONY CS LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
12.6 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 4 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
Plot B at Severn Road Avonmouth BS10 7SE (7 components)
  • • 15.000MW of Battery Energy Storage Systems (2)
  • • 15MW of Battery Energy Storage Systems
  • • Existing Generator Battery Energy Storage System
  • • ... and 1 more unique descriptions
Voltalia UK Ltd Storage Storage (Duration 1h)
1.4 MW
Inactive - 2025-26 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 4 more)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
Slamseys Farm, Blackley Lane, Great Notley, CM77 7QW (9 components)
  • • 5MW, 1 hour/5MWh lithium-ion battery (4)
  • • Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
BRAINTREE ELECTRIC FORECOURT LTD Storage Storage (Duration 1h)
0.9 MW
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-4) (and 5 more)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (6 components)

The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV (4)

GRIDRESERVE LTD Storage Storage (Duration 1h)
Inactive - 2023-24 (T-4), 2022-23 (T-3), 2022-23 (T-1) (and 2 more)
Catsbrain Farm, Stratton St Margaret, Swindon, SN3 4TD (8 components)

The CMU component at Catsbrain Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C3 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Russell Farm, Hursley, Winchester SO21 2UZ (8 components)

The CMU component at Russell Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 20 MW export capacity and an import capacity of 20 … (5)

GHEB2 C2 Limited Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Whitehouse Farm, Rhydd Road, Guarlford, WR13 6NZ (8 components)

The CMU component at Whitehouse Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 C6 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Breach Farm, Swadlincote, Derbyshire, DE12 6RJ (8 components)

The CMU component at Breach Farm is an energy storage system comprised of Lithium-ion batteries. The system will have a 40 MW export capacity and an import capacity of 40 … (5)

GHEB2 B1 LIMITED Storage Storage (Duration 1h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 5 more)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (39 components)
  • • BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage) (3)
  • • BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage) (2)
First Hydro Company Storage Storage (Duration 4.5h) Storage (Duration 5.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 7 more)
Showing locations 1 - 16 of 16