Search Map View Statistics Support Us Help Login Register

Storage

29 unique locations 47 components 0 companies Page 1 of 1
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Lochawe, Dalmally, Argyll, PA33 1AN, Scotland (32 components)
  • • Unit 1 Cruachan pumped storage hydro plant (7)
  • • Unit 2 Cruachan pumped storage hydro plant (7)
  • • Unit 4 Cruachan pump storage hydro plant (6)
  • • ... and 5 more unique descriptions
DRAX PUMPED STORAGE LIMITED Storage Storage (Duration 12h)
870.3 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 8 more)
Rockingham South, Smoke Land, Avonmouth BS11 0YT (5 components)
  • • 10 x 2MW OCGT gas reciprocating engines
  • • 3 x 2MW OCGT gas reciprocating engines
  • • 4 x 2MW OCGT gas reciprocating engines
  • • ... and 2 more unique descriptions
ENERSYST LIMITED Storage Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines (Fuel Type - Gas)
9.4 MW
Inactive - 2027-28 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Lochawe, Dalmally. Argyll. PA33 1AN. Scotland (12 components)
  • • Cruachan pump storage hydro plant - Unit 3 (2)
  • • Cruachan pumped storage hydro plant - Unit 2 (2)
  • • Cruachan pump storage hydro plant - Unit 4
DRAX PUMPED STORAGE LIMITED Storage Storage (Duration 12h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 1 more)
Stanstead Abbots Ware Hertfordshire SG12 8JY (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 10 LIMITED Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Camilla Farm, Auchtertool, Kircaldy, Fife, KY2 5XW (2 components)
  • • Battery storage facility with 49.950MW interconnected capacity for both export and import
  • • Battery storage facility with 49MW interconnected capacity for both export and import
AES Energy Storage UK Limited Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4)
2-6 Judds Lane, Coventry, West Midlands, CV6 6AQ (5 components)
  • • Diesel and/or gas reciprocating engines. (2)
  • • Battery Storage Facility
  • • Gas reciprocating engines.
Peak Power Connections Limited Storage OCGT and Reciprocating Engines
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Foyers Power Station, Kelvin Way, Gorthleck, Foyers, Inverness-shire, IV2 6YB (8 components)
  • • Generating Unit 1 (3)
  • • Generating Unit 2 (2)
SSE GENERATION LIMITED Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Barnfield Road Swindon SN2 2DJ (2 components)

A new power plant, with associated civil works, switchgear and electrical connection. (2)

PEAK GEN POWER 24 LIMITED Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (5 components)
  • • 20MW Battery Storage Facility located in Sudbury, Essex. (2)
  • • 20 MW of DSR
  • • 20 MW of demand reduction
BESS Claredown Limited DSR Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2020-21 (T-1) (and 2 more)
Longcliffe Quarry, B5056, Matlock, Derbyshire DE4 4HN, UK (8 components)
  • • Diesel and/or gas reciprocating engines. (2)
  • • Battery Storage facility
  • • gas reciprocating engines.
LEVEN HOLDINGS LIMITED Storage OCGT and Reciprocating Engines
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Little Holt, Holt Lane, Hook RG27 9ER (5 components)
  • • 5MW battery energy storage facility at Little Holt, Holt Lane, Hook (2)
  • • 6MW battery energy storage facility at Little Holt, Holt Lane, Hook (2)
GBSL HOOK LIMITED Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1) (and 1 more)
Land at Huggins Hall Farm, Turnden Road, Hartley, Kent, TN17 2QJ (6 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (5)

GLASSENBURY BATTERY STORAGE LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
350 Petre Street Sheffield S4 8LU (10 components)
  • • New build battery. (3)
  • • New build battery
Petre Street Storage Ltd Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2018-19 (T-1)
33 Oxford Road Yeovil BA21 5HR (6 components)
  • • New build battery (2)
  • • New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
CONRAD (YEOVIL) LIMITED Storage OCGT and Reciprocating Engines (Fuel Type - Gas)
Inactive - 2021-22 (T-4), 2020-21 (T-4)
Transport Yard, Parsonage Street, Oldbury, B69 4PH (4 components)
  • • Diesel and/or gas reciprocating engines. (2)
  • • Battery Storage Facility
Peak Power Connections Limited Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2017-18 (T-1)
Land adjacent to Vauxhall Effluent Treatment Works, North Road, Ellesmere Port, Cheshire CH65 1AL (6 components)

The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system. (3)

SIGBAT A LIMITED Storage Storage (Duration 1h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
West Burton Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (2 components)
  • • West Burton B Power Station CMU 4 [WB4C16] (New build battery storage project)
  • • West Burton B Power Station CMU 4 [WB4C17] (New build battery storage project)
WEST BURTON B LIMITED Storage
Inactive - 2020-21 (T-4), 2018-19 (T-1)
Blackburn Meadows Power Station, Alsing Road, Tinsley, Sheffield, S9 1HF (3 components)

A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The … (3)

E.ON UK CHP LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Rampside Road, Roosecote, Barrow in Furness, Cumbria, LA130PQ (3 components)

A Prospective New Build Battery Storage facility (3)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1)
Woodend Farm, Bigrigg, Cumbria, CA22 2TA (5 components)

Lithium Ion battery storage system capable of importing, storing and exporting electricity. (4)

CLEATOR BATTERY STORAGE LIMITED Storage Storage (Duration 0.5h)
Inactive - 2020-21 (T-4), 2019-20 (T-1), 2018-19 (T-1) (and 1 more)
Ffestiniog Power Station, Tanygrisiau, Blaenau Ffestiniog, LL41 3TP (39 components)
  • • BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage) (3)
  • • BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage) (2)
First Hydro Company Storage Storage (Duration 4.5h) Storage (Duration 5.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 7 more)
Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (31 components)
  • • The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system. (2)
  • • The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
SIGBAT C LIMITED Storage Reciprocating engines Storage (Duration 1h) OCGT and Reciprocating Engines (Fuel Type - Diesel)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 7 more)
Milton Court Farm, Dorking, RH4 3LY (6 components)
  • • 6MW battery energy storage facility at Milton Court Farm, Dorking (3)
  • • 5MW battery energy storage facility at Milton Court Farm, Dorking (2)
GBSL DORKING LIMITED Storage Storage (Duration 1h)
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2019-20 (T-1) (and 2 more)
Amersham Road Denham Buckinghamshire SL9 7AW (5 components)

A new power plant, with associated civil works, switchgear and electrical connection. (5)

Field Gerrards Cross Ltd Storage Storage (Duration 0.5h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Hill Farm Spring Lane Packington Ashby de la Zouch Leicestershire LE65 1WU (2 components)
  • • The 9.8MW CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries.
  • • The CMU component at Hill Farm, Packington is an energy storage system comprised of Lithium-ion batteries. The system will have …
BESS HILL FARM Limited Storage
Inactive - 2020-21 (T-4), 2018-19 (T-1)
Upton Lane, adjacent to Rownhams BSP Substation SO16 0XY (7 components)

10MW battery energy storage facility at Upton Lane, Rownhams (5)

GBSL NURSLING LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4) (and 2 more)
Nunhide Lane Theale Berkshire RG31 7SD (3 components)

A new power plant, with associated civil works, switchgear and electrical connection. (3)

PEAK GEN POWER 26 LIMITED Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-4)
Showing locations 1 - 29 of 29