Storage

6 unique locations 12 components 0 companies Page 1 of 1
Unit G, Algernon Industrial Estate, North Shields, Tyne And Wear, NE27 0NB, United Kingdom (13 components)
  • • Existing 25 MW storage site using Lithium Ion Batteries (3)
  • • 25 MW storage site using Lithium Ion Batteries (2)
TYNEMOUTH BATTERY STORAGE LIMITED Storage Storage (Duration 1h) Storage (Duration 0.5h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4) (and 7 more)
Pen-y-Cymoedd Wind Farm, Treherbert Road, Treherbert, Treorchy. Rhondda Cynon Taf. South Wales CF42 5SX (10 components)

A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling. (5)

VATTENFALL WIND POWER LTD Storage Storage (Duration 1h) Storage (Duration 0.5h)
1.3 MW
Inactive - 2023-24 (T-1), 2022-23 (T-1), 2021-22 (T-4) (and 3 more)
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (9 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH. (5)

NEVENDON ENERGY STORAGE LTD Storage Storage (Duration 2h) Storage (Duration 0.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-4) (and 5 more)
Tamerton Road, Roborough, A386, Plymouth PL6 7BQ (5 components)

2MW BESS (5)

KIWI POWER LTD Storage Storage (Duration 1h)
Inactive - 2022-23 (T-4), 2021-22 (T-4), 2020-21 (T-1) (and 2 more)
Land at Claredown Farm Hickford Hill Belchamp St Paul Sudbury Essex CO10 7DW (5 components)
  • • 20MW Battery Storage Facility located in Sudbury, Essex. (2)
  • • 20 MW of DSR
  • • 20 MW of demand reduction
BESS Claredown Limited DSR Storage
Inactive - 2021-22 (T-4), 2020-21 (T-4), 2020-21 (T-1) (and 2 more)
Land at Lookabootye Broxburn West Lothian EH52 5PD (4 components)
  • • New build battery (2)
  • • Operational battery (2)
UK ENERGY STORAGE SERVICES LIMITED Storage Storage (Duration 0.5h)
Inactive - 2021-22 (T-4), 2020-21 (T-1), 2019-20 (T-1) (and 1 more)
Showing locations 1 - 6 of 6