• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
-
• ... and 1 more unique descriptions
2549.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
(4)
-
• The CMU component at Cuxton is an energy storage system comprised of batteries with an import and export capacity of …
4.5 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 6 more)
A new build 22 MW battery storage facility. Comprising of five containerised battery units, ten inverter banks (2 per battery container), associated 33kV transformers, switchgear and cabling.
(5)
1.3 MW
Inactive -
2023-24 (T-1),
2022-23 (T-1),
2021-22 (T-4)
(and 3 more)
-
• 5MW, 1 hour/5MWh lithium-ion battery
(4)
-
• Slamseys is a 5MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, …
0.9 MW
Inactive -
2024-25 (T-4),
2023-24 (T-1),
2022-23 (T-4)
(and 5 more)
The CMU comprises Lithium Ion batteries housed in ISO containers with additional containers used to house the converters.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
-
• A 27MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
(2)
-
• A 20MW (import and export) battery energy storage project. The project consists of containerised Inverters, containerised Li-Ion batteries, Transformers, Customer …
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
2MW BESS
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-1)
(and 2 more)
The CMU component at the Rayleigh Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 10.800MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
This CMU is formed of a battery bank and PCS capable of providing 10MW of power. The system is connected via switch gear and a transformer to the 132kV network …
(4)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
(and 1 more)
The CMU component at the Ipsley Battery Storage Facility will be an energy storage system comprised of batteries and will have import and export capacity of 4MW each.
(3)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2019-20 (T-1)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 20MW Battery Storage Facility located in Sudbury, Essex.
(2)
-
• 20 MW of DSR
-
• 20 MW of demand reduction
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2020-21 (T-1)
(and 2 more)
Battery storage
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 10 MW Storage facility located at Balby, Doncaster.
(2)
-
• 10 MW Storage facility
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(5)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2019-20 (T-1)
(and 2 more)
battery storage
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• New build battery
(2)
-
• Operational battery
(2)
Inactive -
2021-22 (T-4),
2020-21 (T-1),
2019-20 (T-1)
(and 1 more)
The Burbo Bank battery is a 2MW/2MWh Battery located near the Burbo Bank offshore wind farm, and near Scottish Power Energy Network's Wallasey substation.
(2)
Inactive -
2021-22 (T-4),
2019-20 (T-1)
-
• Advanced battery energy storage system
-
• New Build Generation CMU, advanced battery energy storage system
Inactive -
2021-22 (T-4),
2019-20 (T-1)
-
• New Build Generation CMU, advanced battery energy storage system.
-
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive -
2021-22 (T-4),
2019-20 (T-1)
Battery Energy Storage System
(2)
Inactive -
2021-22 (T-4),
2019-20 (T-1)
battery storage
(3)
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
A site with a 10MW, 5MWh (2C) Lithium Ion Battery system, the system is connected to the distribution network via the same connection as a nearby biomass power station. The …
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
A Prospective New Build Battery Storage facility
(3)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
Lithium Ion battery storage system capable of importing, storing and exporting electricity.
(4)
Inactive -
2020-21 (T-4),
2019-20 (T-1),
2018-19 (T-1)
(and 1 more)
6MW BESS
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1)
-
• New build battery
-
• Operational battery
Inactive -
2019-20 (T-1),
2018-19 (T-1)
Battery Storage Plant
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1)
Battery Storage Plant
(2)
Inactive -
2019-20 (T-1),
2018-19 (T-1)
-
• BM Unit T_FFES-3 at Ffestiniog Power Station (Pumped Storage)
(3)
-
• BM Unit T_FFES-4 at Ffestiniog Power Station (Pumped Storage)
(2)
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 7 more)
-
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
(2)
-
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 7 more)
Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.
(5)
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-4)
(and 5 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.2 MW of demand reduction
-
• The CMU component at Knottingley is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• Gas Peaking Reciprocating Engine
(4)
-
• Battery Storage Plant
Inactive -
2024-25 (T-4),
2023-24 (T-4),
2022-23 (T-4)
(and 3 more)
-
• 1.200MW Battery Energy Storage System
(3)
-
• 1.200 MW of demand reduction
-
• The CMU component at Thrybergh is an energy storage system comprised of Lithium-ion batteries. The system will have a 1.2 …
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2022-23 (T-4)
(and 4 more)
-
• A 10MW New Build Battery Storage Site
(2)
-
• A 10MW Existing Generating Battery Storage Site
Inactive -
2021-22 (T-4),
2019-20 (T-1),
2018-19 (T-1)
-
• 6MW battery energy storage facility at Milton Court Farm, Dorking
(3)
-
• 5MW battery energy storage facility at Milton Court Farm, Dorking
(2)
Inactive -
2021-22 (T-4),
2020-21 (T-4),
2019-20 (T-1)
(and 2 more)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import and export capacity …
(3)
-
• The CMU component at Tollgate Farm is an energy storage system comprised of batteries with an import capacity if 49.5 …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import and export …
(3)
-
• The CMU component at Halesworth is an energy storage system comprised of batteries and will have an import capacity of …
(2)
Inactive -
2023-24 (T-4),
2022-23 (T-4),
2022-23 (T-3)
(and 2 more)
A new power plant, with associated civil works, switchgear and electrical connection.
(5)
Inactive -
2022-23 (T-4),
2021-22 (T-4),
2020-21 (T-4)
(and 2 more)