Storage (Duration 9h)
33 unique locations (288 components) - Page 1 of 2
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (3 components) Geocoding Needed
BESS project to be installed within a future Greener Grid Park.
Pikevy Farm, Glenrothes, Fife, KY6 3HD (3 components)
This is a 49.9MW battery storage facility connected at 33kV.
Persley Croft, The Parkway, Aberdeen, AB22 8AN (2 components)
The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …
Persley Croft, The Parkway, Aberdeen AB22 8AN (2 components)
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land west of Roman Camp Road, Calderwood, Broxburn, West Lothian, EH52 5PF (3 components)
Standalone battery storage system connecting at 33kV to the Broxburn substation
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (3 components)
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
Land To The South Of Kemsley Substation, Ypres Drive, Sittingbourne, Kent, ME10 2FB (9 components)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (10 components)
Land To East Of Holmston Roundabout A77T From Whitletts Roundabout To Holmston Roundabout, Ayr, South Ayrshire (1 component) Geocoding Needed
Battery storage CMU
Land South West of Ninfield Substation, Kilnwood Farm, Potmans Lane, Bexhill on Sea, East Sussex, TN39 5JL (1 component)
New build BESS
Land on the north side of Hickling Lane, Dunston, Norwich, NR14 8PW (4 components)
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (4 components)
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (5 components)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (5 components)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (5 components)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (5 components)
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)
New build BESS to be installed within a future Greener Grid Park.
Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT (1 component)
Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (3 components)
Lithium-based battery energy storage system.
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation, G74 4GY (3 components)
Standalone battery storage system connecting at 33kV to the East Killbride substation