Search Map View Statistics Support Us Help Login Register

Storage (Duration 9h)

22 unique locations 33 components 0 companies Page 1 of 1
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Foyers Power Station, Foyers, Inverness, IV2 6YB (16 components)
  • • Generating Unit 1 (3)
  • • Generating Unit 2 (2)
SSE Generation Limited Storage (Duration 9h) Storage (Duration 4.5h) Storage (Duration 5.5h) Storage (Duration 9.5h)
852.1 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Deeside Power Station Zone 4 Weybridge Road Deeside Industrial Park Flintshire CH5 2UL (2 components)
  • • Gas Reciprocating Engines
  • • Grid Scale Battery Energy Storage.
DEESIDE POWER (UK) LIMITED Reciprocating engines Storage (Duration 9h)
53.9 MW
Active - 2028-29 (T-4)
Land East of Feckenham Substation, Astwood Lane, Feckenham B96 6HP (2 components)

New build BESS to be installed within a future Greener Grid Park. (2)

LOGI ENERGY LIMITED Storage (Duration 6h) Storage (Duration 9h)
45.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
  • • CMU ID 22KIN4, a new build battery storage CMU
  • • CMU ID 23KIN4, a new build battery storage CMU
WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 9h)
32.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Three Cocked Hat Plantation Waplington Lane Allerthorpe East Riding Of Yorkshire (No post code, see cover letter) (1 components)

BESS project to be installed within a future Greener Grid Park.

BALWEN LIMITED Storage (Duration 9h)
31.1 MW
Active - 2027-28 (T-4)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 2h) Storage (Duration 9h)
27.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Pikevy Farm, Glenrothes, Fife, KY6 3HD (2 components)

This is a 49.9MW battery storage facility connected at 33kV. (2)

PITKEVEY BATTERY STORAGE LIMITED Storage (Duration 2h) Storage (Duration 9h)
20.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Land west of Roman Camp Road, Calderwood Broxburn West Lothian EH52 5PF (2 components)

Standalone battery storage system connecting at 33kV to the Broxburn substation (2)

BROXBURN ENERGY STORAGE LIMITED Storage (Duration 2h) Storage (Duration 9h)
19.5 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
High Flat Farm BESS, Adjacent to East Kilbride 33kV substation G74 4GY (2 components)

Standalone battery storage system connecting at 33kV to the East Killbride substation (2)

CATHKIN ENERGY STORAGE LIMITED Storage (Duration 2h) Storage (Duration 9h)
19.5 MW
Active - 2027-28 (T-4), 2025-26 (T-1)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 2h) Storage (Duration 9h)
16.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
LAND AT STUDLEY FARM, ATWORTH, MELKSHAM, WILTSHIRE, SN12 8LZ. (2 components)

Lithium-based battery energy storage system. (2)

MELKSHAM CALNE GREEN LIMITED Storage (Duration 9h) Storage (Duration 1.5h)
16.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land on the north side of Hickling Lane, Dunston, Norwich NR14 8PW (2 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 9h)
15.2 MW
Active - 2027-28 (T-4)
Cowley Substation Blackberry Lane Garsington Oxfordshire OX44 9BD (8 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (6)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
PIVOTED POWER LLP Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 5 more)
Land To The South Of Kemsley Substation Ypres Drive Sittingbourne Kent ME10 2FB (6 components)
  • • The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)
  • • The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (2)
PIVOTED POWER LLP Storage (Duration 1h) Storage (Duration 9h)
12.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Persley Croft, The Parkway, Aberdeen AB22 8AN (1 components)

CMU ID 23PER4, a new build battery storage CMU located at Persley Croft, The Parkway, Aberdeen AB22 8AN

PERSLEY CROFT BESS LTD Storage (Duration 9h)
9.1 MW
Active - 2027-28 (T-4)
Land At Drum Farm Keith Moray AB55 5NP (1 components)

Battery storage CMU

FIELD DRUM FARM LTD Storage (Duration 9h)
9.1 MW
Active - 2027-28 (T-4)
Land bounded by The Rake, Lower Jowkin Lane and Furbarn Road, Rochdale. OL11 5UT (1 components)

Rochdale (BES) Ltd is planning to install a battery storage system in an outdoor, fenced compound. Batteries will be installed in standard outdoor CATL modules with an internal racked system. …

ROCHDALE (BES) LTD Storage (Duration 9h)
8.8 MW
Active - 2027-28 (T-4)
Land west of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 9h)
6.5 MW
Active - 2027-28 (T-4)
Land west of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 9h)
5.7 MW
Active - 2027-28 (T-4)
Showing locations 1 - 22 of 22