Storage (Duration 5h)

3 unique locations 3 components 0 companies Page 1 of 1
Map View
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)

A Battery Energy Storage System. (3)

HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 2 more)