Search Map View Statistics Support Us Help Login Register

Storage (Duration 4h)

83 unique locations 177 components 0 companies Page 1 of 2
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
  • • New Build Generating CMU comprising of a battery storage asset (2)
  • • New Build CMU comprising of battery storage and associated plant
CONRAD (DUNKESWELL) LIMITED Storage (Duration 3h) Storage (Duration 4h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Old Trimpell Refinery Site Middleton Road Middleton Heysham LA3 3NT (2 components)

24 x 2MW battery storage units to be installed on designated land within a manufacturing compound on the Old Trimpell Refinery site. (2)

Lancaster Power Limited Storage (Duration 4h)
Inactive - 2023-24 (T-4), 2022-23 (T-4)
West Marsh Road Spalding Lincolnshire PE11 3BB (14 components)
  • • A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (4)
  • • A new open cycle power station comprising gas turbines and associated balance of plant. This is being constructed on brownfield …
SPALDING ENERGY PARK LIMITED Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-4) (and 2 more)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land at Hammonds Drive, Eastbourne BN22 8QJ (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 4h)
0.1 MW
Active - 2025-26 (T-1)
Birch House, Forge Lane, Moorlands Trading Estate, Saltash, PL12 6LX (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network

BATTERY BOX LIMITED Storage (Duration 4h)
0.1 MW
Active - 2025-26 (T-1)
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Station Rd, Clowne, Chesterfield S43 4AB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 4h) Storage (Duration 3.5h)
2.6 MW
Active - 2025-26 (T-1), 2024-25 (T-1)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
3.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 4h)
3.9 MW
Active - 2025-26 (T-1)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 components)

New Build Battery Storage Facility

GRENERGY RENEWABLES UK LIMITED Storage (Duration 4h)
5.2 MW
Active - 2028-29 (T-4)
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

DRAGONS LANE BATTERY STORAGE LIMITED Storage (Duration 4h)
5.5 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (4)

CIRENCESTER SOLAR FARM LTD Storage (Duration 4h)
6.2 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Tillingdown Lane, Caterham, CR3 7JA (2 components)
  • • A 12MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
7.5 MW
Active - 2028-29 (T-4)
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 components)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Hollybush BESS Ltd Storage (Duration 4h)
7.9 MW
Active - 2028-29 (T-4)
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

KEITH STORAGE SOLUTIONS LIMITED Storage (Duration 2h) Storage (Duration 4h)
8.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Eccles Birgham Farm, TD12 4LU. (1 components)

Lithium ion battery storage plant.

ZENOBE ECCLES LIMITED Storage (Duration 4h)
15.4 MW
Active - 2027-28 (T-4)
Showing locations 1 - 50 of 83