Storage (Duration 4h)

42 unique locations 84 components 0 companies Page 1 of 1
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 4h)
584.4 MW
Active - 2028-29 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (2 components)

BESS project to be installed within a future Greener Grid Park.

STATKRAFT UK LTD Storage (Duration 4h)
268.4 MW
Active - 2028-29 (T-4)
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

WEST BURTON C LIMITED Storage (Duration 4h)
208.7 MW
Active - 2028-29 (T-4)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

BALWEN LIMITED Storage (Duration 4h)
88.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
  • • 40MW battery storage located near to the Coalburn North 400kV substation.
  • • 50MW battery storage located near Coalburn North 400kV substation.
  • • 50MW battery storage located near to the Coalburn North 400kV substation.
ZENOBE COALBURN LIMITED Storage (Duration 4h) Storage (Duration 5h)
72.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (1 components)

New Build Storage Facility

GRENERGY RENEWABLES UK LIMITED Storage (Duration 4h)
37.6 MW
Active - 2028-29 (T-4)
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
  • • A 50MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (NORTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
31.3 MW
Active - 2028-29 (T-4)
Coal Aston, Dronfield, S18 3AA (2 components)
  • • A 45MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
28.2 MW
Active - 2028-29 (T-4)
Selby, North Yorkshire, YO8 6PG (2 components)
  • • A 40MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
Plutus Energy LTD Storage (Duration 2h) Storage (Duration 4h)
25.1 MW
Active - 2028-29 (T-4)
Dounreay, Thurso KW14 7RE (2 components)
  • • A 34MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
REAY POWER LIMITED Storage (Duration 2h) Storage (Duration 4h)
21.3 MW
Active - 2028-29 (T-4)
Persley Croft, The Parkway, Aberdeen, AB22 8AN (1 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

PERSLEY CROFT BESS LTD Storage (Duration 4h)
19.8 MW
Active - 2028-29 (T-4)
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (1 components)

New Build Battery Storage Facility

Plutus Energy LTD Storage (Duration 4h)
16.7 MW
Active - 2028-29 (T-4)
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 components)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Hollybush BESS Ltd Storage (Duration 4h)
7.9 MW
Active - 2028-29 (T-4)
Tillingdown Lane, Caterham, CR3 7JA (2 components)
  • • A 12MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
7.5 MW
Active - 2028-29 (T-4)
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 components)

New Build Battery Storage Facility

GRENERGY RENEWABLES UK LIMITED Storage (Duration 4h)
5.2 MW
Active - 2028-29 (T-4)
Part Of Franklin Hodge Building, Ramsden Road, Rotherwas Industrial Estate, HR2 6LR (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Off Bonnington Walk, Lockleaze, Bristol, BS7 9XF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Sewage Pumping Station, Rushbottom Lane, Benfleet SS7 4LW (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Sewage Treatment Works, Stephenson Road, Colchester Business Park, CO4 9AD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Station Rd, Clowne, Chesterfield S43 4AB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX5 2FS (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Unit 1-2, Merrivale Road, Exeter Road Industrial Estate, Okehampton, EX20 1UD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Unit 1 Guildford Road Industrial Estate Hayle TR27 4QZ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land by Redgate House, Vicarage Lane Suffolk Wherstead IP9 2AF (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land Lying To The North Of Mardyke, South Ockenden, RM15 6AP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Maes Y Clawdd, Maesbury Road Industrial Estate, Oswestry SY10 8NN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Two Parcels Of Land Lying To The North West And South West Of Farm Road, Brackley NN13 7EB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land on the East Side of Ackholt Road, Aylesham, Canterbury CT3 3AJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Farr & Harris Ltd, Unit 3, Dyffryn Industrial Estate, Pool Road, Newtown, SY16 3BD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Showing locations 1 - 42 of 42