Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 4h)

24 unique locations 32 components 0 companies Page 1 of 1
Map View
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE33 Limited Storage (Duration 4h)
122.8 MW
Active - 2027-28 (T-4)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE30 Limited Storage (Duration 4h)
92.0 MW
Active - 2027-28 (T-4)
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
  • • 40MW battery storage located near to the Coalburn North 400kV substation.
  • • 50MW battery storage located near Coalburn North 400kV substation.
  • • 50MW battery storage located near to the Coalburn North 400kV substation.
ZENOBE COALBURN LIMITED Storage (Duration 4h) Storage (Duration 5h)
72.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Saint Mary's Lane, Monks Farm, London Borough of Havering, London, Thurrock, Greater London, England, CM13 3EL, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE26 Limited Storage (Duration 4h)
61.3 MW
Active - 2027-28 (T-4)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
  • • 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
  • • 75MW battery storage located near to the National Grid Stalybridge substation.
Zenobe Stalybridge Limited Storage (Duration 2h) Storage (Duration 4h)
58.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Eccles Birgham Farm, TD12 4LU (2 components)
  • • Lithium ion battery storage plant
  • • Lithium ion battery storage plant.
ZENOBE ECCLES LIMITED Storage (Duration 4h)
30.8 MW
Active - 2027-28 (T-4)
Eccles Birgham Farm, TD12 4LU. (1 components)

Lithium ion battery storage plant.

ZENOBE ECCLES LIMITED Storage (Duration 4h)
15.4 MW
Active - 2027-28 (T-4)
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 components)

Lithium ion battery storage plant.

Zenobe Stalybridge Limited Storage (Duration 4h)
15.4 MW
Active - 2027-28 (T-4)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
3.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Showing locations 1 - 24 of 24