Search Map View Statistics Support Us Help Login Register

Storage (Duration 4h)

4 unique locations 13 components 0 companies Page 1 of 1
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (4)

CIRENCESTER SOLAR FARM LTD Storage (Duration 4h)
6.2 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

DRAGONS LANE BATTERY STORAGE LIMITED Storage (Duration 4h)
5.5 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Showing locations 1 - 4 of 4