Storage (Duration 4h)

83 unique locations 177 components 0 companies Page 1 of 2
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (10 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 4h)
584.4 MW
Active - 2028-29 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire PA2 8UY (2 components)

BESS project to be installed within a future Greener Grid Park.

STATKRAFT UK LTD Storage (Duration 4h)
268.4 MW
Active - 2028-29 (T-4)
Land east of Gainsborough Road Bole Nottinghamshire DN22 9EY (4 components)

New-build generating CMU comprising battery storage and associated plant to be constructed adjacent to the existing West Burton B CCGT, Nottinghamshire. Metering of output is Net of auxillary load.

WEST BURTON C LIMITED Storage (Duration 4h)
208.7 MW
Active - 2028-29 (T-4)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (12 components)

Lithium ion battery storage plant (2)

ZENOBE KILMARNOCK SOUTH LIMITED Storage (Duration 4h)
150.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Netherton Farm, Keith AB55 5PE (12 components)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
  • • ... and 1 more unique descriptions
ZENOBE BLACKHILLOCK LIMITED Storage (Duration 2h) Storage (Duration 4h)
124.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Bullen Lane, Bramford, Mid Suffolk, Suffolk, England, IP8 4JH, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE33 Limited Storage (Duration 4h)
122.8 MW
Active - 2027-28 (T-4)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Toddington Road, Harlington, Central Bedfordshire, England, LU5 6LD, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE30 Limited Storage (Duration 4h)
92.0 MW
Active - 2027-28 (T-4)
Thornton Greener Grid Park, Thornton, Melbourne, York, YO42 4RZ (2 components)

BESS project to be installed within a future Greener Grid Park. (2)

BALWEN LIMITED Storage (Duration 4h)
88.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land off Carlisle Road (B7078), JJ's Farm, Coalburn, Lesmahagow, South Lanarkshire, ML11 0JU (4 components)
  • • 40MW battery storage located near to the Coalburn North 400kV substation.
  • • 50MW battery storage located near Coalburn North 400kV substation.
  • • 50MW battery storage located near to the Coalburn North 400kV substation.
ZENOBE COALBURN LIMITED Storage (Duration 4h) Storage (Duration 5h)
72.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Saint Mary's Lane, Monks Farm, London Borough of Havering, London, Thurrock, Greater London, England, CM13 3EL, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE26 Limited Storage (Duration 4h)
61.3 MW
Active - 2027-28 (T-4)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
  • • 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
  • • 75MW battery storage located near to the National Grid Stalybridge substation.
Zenobe Stalybridge Limited Storage (Duration 2h) Storage (Duration 4h)
58.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Spring Lane, Gedling, Nottinghamshire, NG4 4PD (1 components)

New Build Storage Facility

GRENERGY RENEWABLES UK LIMITED Storage (Duration 4h)
37.6 MW
Active - 2028-29 (T-4)
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
  • • A 50MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (NORTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
31.3 MW
Active - 2028-29 (T-4)
Eccles Birgham Farm, TD12 4LU (2 components)
  • • Lithium ion battery storage plant
  • • Lithium ion battery storage plant.
ZENOBE ECCLES LIMITED Storage (Duration 4h)
30.8 MW
Active - 2027-28 (T-4)
Coal Aston, Dronfield, S18 3AA (2 components)
  • • A 45MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
28.2 MW
Active - 2028-29 (T-4)
Selby, North Yorkshire, YO8 6PG (2 components)
  • • A 40MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
Plutus Energy LTD Storage (Duration 2h) Storage (Duration 4h)
25.1 MW
Active - 2028-29 (T-4)
Land east of Bramford Substation, Bullen Lane, Bramford, IP8 4JH (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 2h) Storage (Duration 4h)
23.0 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Dounreay, Thurso KW14 7RE (2 components)
  • • A 34MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
REAY POWER LIMITED Storage (Duration 2h) Storage (Duration 4h)
21.3 MW
Active - 2028-29 (T-4)
Persley Croft, The Parkway, Aberdeen, AB22 8AN (1 components)

The proposed BESS has a capacity of up to 49.9 megawatts (MW) The proposals are likely to consist of: ? 30No. battery storage cubes ? 14No. inverters; ? 7No. transformers; …

PERSLEY CROFT BESS LTD Storage (Duration 4h)
19.8 MW
Active - 2028-29 (T-4)
Scalm Park, Wistow Common, Selby, Yorkshire, YO8 3RD (1 components)

New Build Battery Storage Facility

Plutus Energy LTD Storage (Duration 4h)
16.7 MW
Active - 2028-29 (T-4)
Eccles Birgham Farm, TD12 4LU. (1 components)

Lithium ion battery storage plant.

ZENOBE ECCLES LIMITED Storage (Duration 4h)
15.4 MW
Active - 2027-28 (T-4)
Adjacent to National Grid Stalybridge substation SK15 3DA. (1 components)

Lithium ion battery storage plant.

Zenobe Stalybridge Limited Storage (Duration 4h)
15.4 MW
Active - 2027-28 (T-4)
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

KEITH STORAGE SOLUTIONS LIMITED Storage (Duration 2h) Storage (Duration 4h)
8.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Hollybush, Ebstree Road, Trysull, Wolverhampton, WV5 7JE United Kingdom (1 components)

BESS stand alone projec connected to 49.9MVA import/export to Penn-Wolverhampton West n2 132kV OHL (NGED). The purpose of the BESS is to provide balancing services to the local electricity grid. …

Hollybush BESS Ltd Storage (Duration 4h)
7.9 MW
Active - 2028-29 (T-4)
Tillingdown Lane, Caterham, CR3 7JA (2 components)
  • • A 12MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
7.5 MW
Active - 2028-29 (T-4)
Cirencester Solar Farm Witpit Lane Preston Cirencester GL7 5PW (To Witpit Lane entrance use GL7 5RJ) (5 components)

A 10MW/46.6MWh Battery Energy Storage System to be installed at Cirencester Solar Farm (4)

CIRENCESTER SOLAR FARM LTD Storage (Duration 4h)
6.2 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Dragons Lane, Moston, Sandbach, CW11 3QH (2 components)

12 MW Connection 48 MWh Distribution unit (2)

DRAGONS LANE BATTERY STORAGE LIMITED Storage (Duration 4h)
5.5 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Tyrant Farm, Treowen, Newbridge, Newport, NP11 3BS (1 components)

New Build Battery Storage Facility

GRENERGY RENEWABLES UK LIMITED Storage (Duration 4h)
5.2 MW
Active - 2028-29 (T-4)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Poulton Power, Unit 23, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 4h)
3.9 MW
Active - 2025-26 (T-1)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
3.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 4h) Storage (Duration 3.5h)
2.6 MW
Active - 2025-26 (T-1), 2024-25 (T-1)
Farr & Harris Ltd, Brassey Road, Shrewsbury, SY3 7FA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Heysham Road, Bootle, L30 6TU (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land And Buildings Adjoining Saxilby Road Burton Fen LN1 2BE (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 4h) Storage (Duration 2.5h)
0.2 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Showing locations 1 - 50 of 83