Storage (Duration 3h)

13 unique locations 21 components 0 companies Page 1 of 1
Map View
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
  • • New build generating battery storage unit.
  • • New build generating storage unit
GRESHAM HOUSE DEVCO PIPELINE LIMITED Storage (Duration 2h) Storage (Duration 3h)
48.6 MW
Active - 2028-29 (T-4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (1 components)

New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation

SIZING JOHN LIMITED Storage (Duration 3h)
17.8 MW
Active - 2028-29 (T-4)
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
  • • Battery energy storage unit (2)
  • • New reciprocating genset in acoustic enclosure (2)
FRP MERCIA HOLDCO LIMITED Reciprocating engines Storage (Duration 3h)
0.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2020-21 (T-4) (and 1 more)
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit (2)

POWERTREE (HOLDINGS) LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

POWERTREE (HOLDINGS) LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (2 components)

Battery energy storage unit (2)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land at Common Side Lane, Featherstone, WF7 5DF (2 components)

Battery energy storage unit (2)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit (2)

FRP MERCIA HOLDCO LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (2 components)

Battery energy storage unit (2)

CORBY POWER LIMITED Storage (Duration 3h)
0.3 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)