Storage (Duration 3h)

35 unique locations 50 components 0 companies Page 1 of 1
Minchens Lane Bramley Tadley RG26 5BJ (4 components)
  • • 99.000MW Battery Energy Storage site (3)
  • • New Build Battery Energy Storage site
BRAMLEY BATTERY STORAGE LIMITED Storage (Duration 3h) Storage (Duration 2.5h)
87.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
  • • New build generating battery storage unit.
  • • New build generating storage unit
GRESHAM HOUSE DEVCO PIPELINE LIMITED Storage (Duration 2h) Storage (Duration 3h)
48.6 MW
Active - 2028-29 (T-4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (1 components)

New Build transmission connected Battery Storage site on land Adjacent to National Grid's Rainhill Substation

SIZING JOHN LIMITED Storage (Duration 3h)
17.8 MW
Active - 2028-29 (T-4)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
3.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h)
3.4 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h)
2.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Letchworth Power, Dunhams Lane, Letchworth Garden City, SG6 1JH (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

URBAN RESERVE STORAGE LIMITED Storage (Duration 3h)
1.1 MW
Active - 2027-28 (T-4)
Land at Common Side Lane, Featherstone, WF7 5DF (2 components)

Battery energy storage unit (2)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
5 Foxwood Rd, Chesterfield, S41 9RA (2 components)

Battery energy storage unit (2)

POWERTREE (HOLDINGS) LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
4 Sidings Rd, Kirkby in Ashfield, Nottingham NG17 7JZ (2 components)

Battery energy storage unit (2)

POWERTREE (HOLDINGS) LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Former Cascade Works, Wellington Road, Burton Upon Trent, DE14 2AP (2 components)

Battery energy storage unit (2)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (4 components)
  • • Battery energy storage unit (2)
  • • New reciprocating genset in acoustic enclosure (2)
FRP MERCIA HOLDCO LIMITED Reciprocating engines Storage (Duration 3h)
0.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-1), 2020-21 (T-4) (and 1 more)
Albion Close, Worksop, S80 1RA (2 components)

Battery energy storage unit (2)

FRP MERCIA HOLDCO LIMITED Storage (Duration 3h)
0.7 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land at Enterprise Court Geddington Rd, Geddington, Corby, NN18 8ES (2 components)

Battery energy storage unit (2)

CORBY POWER LIMITED Storage (Duration 3h)
0.3 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land off Fishleigh Road, Roundswell Business Park, Barnstaple, EX31 3TD (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Land Forming Part Of Newton Road, Bovey Tracey, Newton Abbot TQ13 9DR (3 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (3)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
0.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2024-25 (T-1)
Tabor Avenue Reservoir, CM7 1FB (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land at Exeter College Future Skills Centre, Silverdown Office Park, EX5 2LJ (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Stephenson Road, Colchester Business Park, CO4 9QP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land At South End of Mullacott Cross Industrial Estate, West Down EX34 8FN (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Land on the North Side of Blackhorse Lane, Exeter, EX1 3FP (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Anglian Water Services Limited, Pineham, Milton Keynes, MK15 9PA (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Tower, Knight Street, Pinchbeck, Spalding, PE11 3XD (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Water Pumping Station, Watson Road, MK42 6BL (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

Waterswallows Energy Limited Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Sewage Treatment Works, Chelmsford Road, Dunmow, CM6 1XG (2 components)

CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network (2)

BATTERY BOX LIMITED Storage (Duration 3h) Storage (Duration 4h)
0.0 MW
Active - 2027-28 (T-4), 2024-25 (T-1)
Philip Street Scrapyard, Philip Street, St Philips, Bristol, BS2 0TA (1 components)

New Build CMU comprising of battery storage and associated plant

CONRAD ENERGY (DEVELOPMENTS) LIMITED Storage (Duration 3h)
Active - 2024-25 (T-4)
24a Flightway Dunkeswell Honiton EX14 4LG (8 components)
  • • New Build Generating CMU comprising of a battery storage asset (2)
  • • New Build CMU comprising of battery storage and associated plant
CONRAD (DUNKESWELL) LIMITED Storage (Duration 3h) Storage (Duration 4h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-4) (and 1 more)
Gas Works Road, Lowestoft, NR32 1UZ (4 components)
  • • New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)
  • • New Build CMU comprising of battery storage and associated plant
CONRAD (LOWESTOFT) LIMITED Reciprocating engines Storage (Duration 3h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Aber Park Road, Flint Flintshire CH6 5EX (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) LIMITED Storage (Duration 3h)
Inactive - 2024-25 (T-4), 2021-22 (T-1)
Showing locations 1 - 35 of 35