Search Map View Statistics Support Us Help Login Register

Storage (Duration 3.5h)

7 unique locations 7 components 0 companies Page 1 of 1
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
  • • BESS project to be installed within a future Greener Grid Park. (3)
  • • 50MW of BESS to be installed within a future Greener Grid Park. (2)
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 8h) Storage (Duration 3.5h)
38.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Land south of Inglis Farm, Cockenzie, East Lothian, EH32 0JT. (1 components)

New build battery energy storage unit.

COCKENZIE STORAGE LIMITED Storage (Duration 3.5h)
36.6 MW
Active - 2028-29 (T-4)
Land north west of Braintree Substation, Braintree Road, Cressing, Braintree, CM77 8EZ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 3.5h)
15.5 MW
Active - 2025-26 (T-1)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Dellsome Power, Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (3 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
3.7 MW
Active - 2027-28 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Glowhouse Power, 135 Clydesdale Place, Moss Side Industrial Estate, Leyland, PR26 7QS (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 4h) Storage (Duration 3.5h)
2.6 MW
Active - 2025-26 (T-1), 2024-25 (T-1)
Poulton Power, Cocker Avenue, Poulton Industrial Estate, FY6 8JU (1 components)

CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV network

URBAN RESERVE STORAGE LIMITED Storage (Duration 3.5h)
Active - 2024-25 (T-1)
Showing locations 1 - 7 of 7