Search Map View Statistics Support Us Help Login Register

Storage (Duration 2h)

509 unique locations 1075 components 0 companies Page 1 of 11
Land at Enderby Substation, Beggars Lane, Leicester, LE19 4AD (3 components)

A Battery Energy Storage System. (2)

GSES 1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land directly South to Coventry Substation, Parrotts Grove, AldermanCoventry, CV2 1NQ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Inactive - 2023-24 (T-1)
Former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (1 components)

CMU to comprise multiple individual storage units metered and despatched centrally

Sembcorp Utilities (UK) Limited Storage (Duration 2h)
Active - 2025-26 (T-4)
Land at Jamesfield Farm, Abernethy, Fife, KY14 6EW (2 components)

A new build 19MW battery energy storage system (2)

HARMONY JF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
Jameston Farm, Dalry, North Ayrshire, KA24 4EY (1 components)

9 x 2.222MW/4.874MWh storage units installed on designated land within a brownfield site at Jameston Farm, Dalry, North Ayrshire, KA24 4EY.

ARRAN VIEW STORAGE LTD Storage (Duration 2h)
Active - 2025-26 (T-4)
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Broadditch Farm, New Barn Road, Southfleet, DA13 9PU (6 components)
  • • A new build 11MW battery storage system (4)
  • • A new build 10MW battery storage system
HARMONY BD LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Land North East of Jamesfield Organic Centre, Newburgh, KY14 6EW (6 components)
  • • A new build 30MW battery energy storage system (3)
  • • A new build 29MW battery energy storage system
HARMONY JF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Gerard Hall Battery Site, Mill Lane, Nursling SO16 0YE (2 components)

New Battery Storage Site comprising brand new batteries & inverters

Gerard Hall Energy Limited Storage (Duration 1h) Storage (Duration 2h)
Active - 2025-26 (T-4)
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (5 components)
  • • A New Build Gas fuelled power plant at Capenhurst substation (3)
  • • A New Build Battery Energy Storage System (2)
HD888CAP LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 2 more)
LAND AND BUILDINGS ON THE SOUTH EAST SIDE AND ON THE NORTH WEST SIDE OF CRANBORNE ROAD POTTERS BAR EN6 3JF (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Bilbo Farm, Crimond, Fraserburgh, AB43 8YP (1 components)

New Build CMU comprising of battery storage and associated plant

LEL BILBO BATTERY LIMITED Storage (Duration 2h)
Active - 2025-26 (T-4)
Land South East of Lawns Farm, Park Lane, Cottingham, East Riding Of Yorkshire, HU16 5SB (5 components)
  • • A 49.5MW battery energy storage system (3)
  • • A 48MW battery energy storage system
HARMONY (PW) LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
Land to the rear of Poulson Plant Hire, Wrecclesham Hill, Farnham, GU10 4JU (5 components)
  • • A new build 20MW battery energy storage system (3)
  • • A new build 19MW battery energy storage system
HARMONY FM LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2022-23 (T-4) (and 2 more)
The Manorway, Stanford-leHope, SS17 9LL (5 components)
  • • A gas fuelled generating station (2)
  • • A Battery Energy Storage System
CORPOWER LIMITED Reciprocating engines Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
Active - 2025-26 (T-4), 2024-25 (T-1)
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (4 components)
  • • CMU consisting of multiple reciprocating engines and alternators (3)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Reciprocating engines Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2023-24 (T-4), 2022-23 (T-3) (and 1 more)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Inactive - 2023-24 (T-1)
LAND AT DUNHAMS LANE LETCHWORTH GARDEN CITY SG6 1JH (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Mill Hill Farm, Hazel Grove, SK12 1EG (1 components)

A Battery Energy Storage System

ETP-QQR ENERGY LIMITED Storage (Duration 2h)
Active - 2025-26 (T-4)
Land at Hawkers Hill, Motcombe, Shaftesbury, Dorset, SP7 9NP, (4 components)

This is a 20MW battery storage facility connected at 33kV. (4)

HAWKERS HILL ENERGY PARK LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components)
  • • 20MW of Battery Energy Storage Systems
  • • 26.000MW of Reciprocating Engines
BLUEFIELD SANDBACH LIMITED Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4)
Land at Gagie Home Farm Holdings, Tealing, DD5 3PP (1 components)

New Build CMU comprising of battery storage and associated plant

SIRIUS ECODEV (TEALING) LTD Storage (Duration 2h)
Active - 2025-26 (T-4)
Land at Netherton Street, Netherton, Wishaw, North Lanarkshire, ML2 0EF (4 components)
  • • 49.95MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
  • • 49.95MW Battery Storage site at Wishaw. Connected via 33kV substation directly to Transmission network.
  • • 49.9MW Battery Storage site at Wishaw, split into two BMU's (which are not yet registered). Connected via 33kV substation directly …
Zenobe Wishaw Limited Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Unit 1, Brindley Close, Cheney Manor Industrial Estate, Swindon, SN2 2YW (3 components)

12MW 24MWh battery storage located at Brindley Close in Swindon (3)

Zenobe Brindley Limited Storage (Duration 2h)
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land at STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16MW, located in Buxton.

Buxton Power Limited Storage (Duration 2h)
Active - 2025-26 (T-1)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JB (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Buxton Power Limited Storage (Duration 2h)
Active - 2024-25 (T-1)
Mannington Depot, Mannington Depot Service Road Mannington Swindon SN5 8BA (3 components)

A Battery Energy Storage System. (3)

SW MANNINGTON LIMITED Storage (Duration 2h)
Inactive - 2024-25 (T-4), 2023-24 (T-1), 2022-23 (T-1)
Land at Vause Farm, Town Lane, Charnock Richard, Chorley, PR7 5HL (1 components)

New Build CMU comprising of battery storage and associated plant

SIRIUS ECODEV (VAUSE) LTD Storage (Duration 2h)
Active - 2025-26 (T-4)
Land directly South to Coventry Substation Parrotts Grove Coventry CV2 1NQ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Whitegate Substation, Broadgate, Oldham, OL9 9XA (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD144WHI LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
Land at Ocker Hill Substation, Power Way, Tipton, DY4 0PW (3 components)
  • • A Battery Energy Storage System. (2)
  • • A New Build Gas fuelled power plant.
HD143OCK LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1)
LAND ON THE EAST SIDE OF CORONATION SQUARE ARDWICK M12 6EL (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
Active - 2024-25 (T-4)
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
  • • A transmission connected battery storage unit
  • • A transmission connected solar park.
CLEVE HILL SOLAR PARK LIMITED Solar Photovoltaic Storage (Duration 2h)
Active - 2024-25 (T-4)
Land at Monk Fryston Substation, Rawfield Lane, Leeds, LS25 5JD (3 components)
  • • A Battery Energy Storage System
  • • A Battery Energy Storage System.
  • • A New Build Gas fuelled power plant
HD777FRY LTD Reciprocating engines Storage (Duration 2h)
Active - 2025-26 (T-4), 2024-25 (T-4)
Land north east of Bustleholm Substation Painswick Close Walsall WS5 4SJ (1 components)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
Active - 2024-25 (T-4)
Showing locations 1 - 50 of 509