Storage (Duration 2h)

157 unique locations 419 components 0 companies Page 1 of 4
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
  • • New Build Battery Storage (2)
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 4 LIMITED Storage (Duration 2h)
197.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1)
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

ECCLES ENERGY CENTRE LIMITED Storage (Duration 2h)
148.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Land south of the Rayleigh Main Substation, SS11 8TZ (1 components)

New build generating battery storage unit

GRESHAM HOUSE DEVCO PIPELINE LIMITED Storage (Duration 2h)
83.8 MW
Active - 2028-29 (T-4)
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

PD503HAN LTD Storage (Duration 2h) Storage (Duration 8h)
79.3 MW
Active - 2028-29 (T-4), 2025-26 (T-4)
Braehead Farm Riccarton Kilmarnock KA1 5LN (4 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land, approximately 250 Metres north of Kilmarnock Substation. …

KILMARNOCK ENERGY CENTRE LIMITED Storage (Duration 2h)
71.2 MW
Active - 2028-29 (T-4)
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU. (2)

KONA ASSET 3 LIMITED Storage (Duration 2h)
70.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
  • • Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
67.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
  • • New Build Battery Storage
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 6 LIMITED Storage (Duration 2h)
61.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
  • • New Build Battery Storage
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 3 LIMITED Storage (Duration 2h)
61.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Somerford Farm, SN16 9RN (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
PD688IRO LTD Storage (Duration 2h) Storage (Duration 8h)
58.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

ADV 005 LIMITED Storage (Duration 2h) Storage (Duration 9.5h)
53.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Smith Road, Wednesbury, WS10 0PD (2 components)
  • • New build generating battery storage unit.
  • • New build generating storage unit
GRESHAM HOUSE DEVCO PIPELINE LIMITED Storage (Duration 2h) Storage (Duration 3h)
48.6 MW
Active - 2028-29 (T-4)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
  • • BESS project to be installed within a future Greener Grid Park. (3)
  • • 50MW of BESS to be installed within a future Greener Grid Park. (2)
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 8h) Storage (Duration 3.5h)
38.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
  • • A Battery Energy Storage System. (3)
  • • A New Build Gas fuelled power plant.
HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Land adjacent to Worset Lane, Hart. TS27 3BL (1 components)

Battery Energy Storage System connecting into the Hartmoor GSP, to connect into the Transmission system via new bay.

FIELD HARTMOOR LTD Storage (Duration 2h)
35.5 MW
Active - 2028-29 (T-4)
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
FLEXION ENERGY SPV 2 LTD Storage (Duration 2h)
34.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Gas fuelled power plant at Kirkby substation. (2)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)
Land off Walton Road, Drakelow, Derbyshire, DE15 9TX (1 components)

New-build energy storage site

HARMONY DL LIMITED Storage (Duration 2h)
31.4 MW
Active - 2028-29 (T-4)
Wadsworth Farm, Toronto, Bishop Auckland DL14 7RL (2 components)
  • • A 50MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (NORTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
31.3 MW
Active - 2028-29 (T-4)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (24 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
29.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at The Magazine, Hull Road, Selby, YO8 5BJ (24 components)
  • • Battery energy storage unit (2)
  • • Battery storage unit (2)
Plutus Energy LTD Storage (Duration 2h)
29.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Wolverhampton West, Land North of Langley Road, Castlecroft, Wolverhampton, NEAREST POSTCODE WV4 4XX (3 components)
  • • Two hour duration battery storage (2)
  • • Two duration battery storage
CARE POWER (WOLVERHAMPTON) LIMITED Storage (Duration 2h)
28.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1)
Coal Aston, Dronfield, S18 3AA (2 components)
  • • A 45MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
28.2 MW
Active - 2028-29 (T-4)
Land at Armshead Farm, Armshead Road, Werrington, Staffordshire, ST9 0NB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
27.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Burton Green Farm, Hobs Lane, Kenilworth, Warwickshire, CV8 1QB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
27.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Ipswich Road, Cardiff, CF23 9AQ (10 components)
  • • New build two-hour duration battery storage (2)
  • • New build one-hour duration storage
GFV-1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
26.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Selby, North Yorkshire, YO8 6PG (2 components)
  • • A 40MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
Plutus Energy LTD Storage (Duration 2h) Storage (Duration 4h)
25.1 MW
Active - 2028-29 (T-4)
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
24.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (21 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
24.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
LAND TO THE REAR OF HUMBERSTON SUBSTATION, HUMBERSTON, DN36 4RJ (3 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.9MW Battery Energy Storage system
HARMONY HB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
22.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Dounreay, Thurso KW14 7RE (2 components)
  • • A 34MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
REAY POWER LIMITED Storage (Duration 2h) Storage (Duration 4h)
21.3 MW
Active - 2028-29 (T-4)
Land South of Inglis Farm, Cockenzie, East Lothian, EH32 0JT (1 components)

New build generating storage asset

COCKENZIE STORAGE LIMITED Storage (Duration 2h)
20.9 MW
Active - 2028-29 (T-4)
Showing locations 1 - 50 of 157