Home List View Map View Technologies Companies Support Us Help Login Register
Theme

Storage (Duration 2h)

157 unique locations 419 components 0 companies Page 1 of 4
Map View
Link Road, Launceston, Cornwall, PL15 9LP England (2 components)
  • • New-Build Li-Ion BESS, 2hr duration.
  • • Recently-commissioned, existing Li-Ion BESS, 2hr duration.
GRIDBEYOND LIMITED Storage (Duration 2h)
0.6 MW
Active - 2028-29 (T-4), 2024-25 (T-1)
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (6 components)

Battery energy storage unit (6)

FRP MERCIA HOLDCO LIMITED Storage (Duration 2h)
1.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
St Philips energy storage facility, Philip Street, St Philips Marsh, Bristol, BS2 0TA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD (ST PHILIPS) LIMITED Storage (Duration 2h)
1.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Mount Stamper Road, St Austell, Cornwall, PL25 5QP (1 components)

New-Build Li-Ion BESS, 2hr duration.

GRIDBEYOND LIMITED Storage (Duration 2h)
2.1 MW
Active - 2028-29 (T-4)
Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (2 components)

Lithium ion battery storage system capable of charging, storing and discharging electricity. (2)

NEVENDON ENERGY STORAGE LTD Storage (Duration 2h)
2.6 MW
Active - 2028-29 (T-4), 2025-26 (T-1)
Land West Of Slack Lane, Westhoughton, Bolton BL5 3LB (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
3.1 MW
Active - 2028-29 (T-4)
Duniface Farm, Windygates, Fife, KY8 5RH (1 components)

New build Battery Energy Storage CMU

BERYL STREET GENERATION LIMITED Storage (Duration 2h)
3.2 MW
Active - 2028-29 (T-4)
Immingham Road Stallingborough North East Lincolnshire DN41 8BS (1 components)

The construction involves the development of a Battery Storage Energy System on a site close to the grid connection point. The works involve ground works in preparation for the installation …

MAUXHALL FARM ENERGY PARK LIMITED Storage (Duration 2h)
3.2 MW
Active - 2028-29 (T-4)
West House Farm, Scruton, Northallerton, DL7 0RQ (1 components)

18MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

LEEMING SOLAR FARM LIMITED Storage (Duration 2h)
3.8 MW
Active - 2028-29 (T-4)
Slack Lane, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
4.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land off Widow Hill Road, Burnley, BB10 2TB (1 components)

New Build CMU comprising of battery storage and associated plant

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
4.1 MW
Active - 2028-29 (T-4)
Deep Lane BESS, Plympton, Devon, PL7 5AA (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
4.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Dadglow Farm, Bishops Itchington, Southam, CV47 2SW (1 components)

A 20MW Distribution Connected Battery Energy Storage System

ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h)
4.2 MW
Active - 2028-29 (T-4)
165 Fordhouse Lane Stirchley Birmingham B30 3AG (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
4.2 MW
Active - 2028-29 (T-4)
Land at Duddingston, Newton, West Lothian, EH30 9SN (1 components)

20MW, 2-hour duration battery energy storage system (BESS). BESS is being constructed alongside a co-located solar PV farm which it shares a grid connection with. Solar PV farm has secured …

AITHRIE NET ZERO LIMITED Storage (Duration 2h)
4.2 MW
Active - 2028-29 (T-4)
Plot 4A, Hurlawcrook Road, East Kilbride, Glasgow G75 0ZZ (1 components)

A distribution connected New Build Battery Energy Storage System

EAST KILBRIDE PROJECT COMPANY LTD Storage (Duration 2h)
4.2 MW
Active - 2028-29 (T-4)
Land 800m North of Suttieside Road, Forfar, Scotland, DD83NL (1 components)

2 hour Battery Energy Storage System

SUTTIESIDE BATTERY LIMITED Storage (Duration 2h)
4.4 MW
Active - 2028-29 (T-4)
Land lying to the east of Rectory Lane, Upton Warren, Bromsgrove, B61 7ET (1 components)

This is a 29.700 MW battery storage facility connected at 66kV.

RECTORY FARM ENERGY STORAGE LTD Storage (Duration 2h)
4.7 MW
Active - 2028-29 (T-4)
Burton Enterprise Park Hawkins Lane Burton upon Trent Staffordshire DE14 1QG (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
5.2 MW
Active - 2028-29 (T-4)
Chesterfield Road, Sheffield, West Yorkshire, S26 4XB (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
5.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
  • • A new build, battery energy storage system (2)
  • • A new build, gas fueled generation station.
BAKER STREET GENERATION LIMITED Reciprocating engines Storage (Duration 2h)
5.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4)
Perimeter Road, Ince, Elton, Cheshire West & Chester, CH2 4RX (2 components)

A new build, battery energy storage system (2)

BERYL STREET GENERATION LIMITED Storage (Duration 2h)
5.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land off School Lane, Sittingbourne, Kent, ME9 8BY (1 components)

New Build CMU comprising of battery storage and associated plant

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
5.7 MW
Active - 2028-29 (T-4)
Templeton Farm, Birkhill, Dundee, Scotland. DD3 0QH (1 components)

A 2-hour duration containerized battery

TEMPLETON BATTERY STORAGE LIMITED Storage (Duration 2h)
5.9 MW
Active - 2028-29 (T-4)
Childerley Farm, Dry Drayton, Cambridgeshire, United Kingdom, CB23 8BA (1 components)

New build BESS alongside new build solar farm.

STARGOOSE CLEAN ENERGY LIMITED Storage (Duration 2h)
6.2 MW
Active - 2028-29 (T-4)
Land West Of Slack Lane, Westhoughton, Bolton, BL5 3LB (1 components)

Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration

FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
6.3 MW
Active - 2028-29 (T-4)
The fields close to the Land at Little Hale Drove, Sleaford, NG34 9BG, United Kingdom (1 components)

LHBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

AGR SOLAR 3 LIMITED Storage (Duration 2h)
6.3 MW
Active - 2028-29 (T-4)
The fields close to The Cottage, The Priory, Priory Lane, Little Wymondley, Hitchin, SG4 7HD (1 components)

WYBESS (CMU) is a new build generating 49.995MW / 99.990MWh battery storage system (BESS).

AGR SOLAR 4 LIMITED Storage (Duration 2h)
6.3 MW
Active - 2028-29 (T-4)
Land On The South East Side Of Medlock Road, Failsworth, Manchester M35 9WG (1 components)

A 30MW Distribution Connected Battery Energy Storage System

ROOT-POWER (NORTH) LIMITED Storage (Duration 2h)
6.3 MW
Active - 2028-29 (T-4)
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, Wiltshire, SN12 8LT (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
6.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land East of Bowbridge Lane, New Balderton, Newark, Nottinghamshire, NG24 3BY (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
6.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
St Owens Cross, Peterstow, Hereford, HR9 6AU (1 components)

A lithium-ion Energy Storage Plant

ST OWENS CROSS BATTERY STORAGE LIMITED Storage (Duration 2h)
7.2 MW
Active - 2028-29 (T-4)
Land At Westerton Road, Keith, Moray, AB55 5NR (1 components)

CMU 24KEI4 is a battery storage CMU.

FIELD KEITH LTD Storage (Duration 2h)
7.2 MW
Active - 2028-29 (T-4)
Land adjacent to Berryburn Substation Moray (1 components)

Corshellach Energy Storage Limited is planning to install a 2-hr battery storage system.

CORSHELLACH ENERGY STORAGE LIMITED Storage (Duration 2h)
7.4 MW
Active - 2028-29 (T-4)
Land 300M NE Of Bridge Of Dun Substation Dun Montrose (1 components)

2 hour containerised battery storage

DUNMILL ENERGY STORAGE LIMITED Storage (Duration 2h)
7.4 MW
Active - 2028-29 (T-4)
Tillingdown Lane, Caterham, CR3 7JA (2 components)
  • • A 12MW Distribution Connected Battery Energy Storage System
  • • A Distribution Connected Battery Energy Storage System
ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h) Storage (Duration 4h)
7.5 MW
Active - 2028-29 (T-4)
Land northeast of Kingston Road, Slimbridge, Gloucestershire, GL27BW (1 components)

2 hour Battery Energy Storage System

SLIMBRIDGE ENERGY LIMITED Storage (Duration 2h)
7.5 MW
Active - 2028-29 (T-4)
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, Greater Manchester, OL16 2XX (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
7.6 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Castlelaurie Industrial Estate, Bankside, Falkirk FK2 7XF (1 components)

New build battery storage

FALKIRK POWER LTD Storage (Duration 2h)
7.7 MW
Active - 2028-29 (T-4)
Dunbar BESS, Dunbar, East Lothian, EH42 1RG, Scotland, UK (1 components)

Total Connection capacity of 49.99MW for Energy Storage. The component will be LFP BESS.

FRV POWERTEK LIMITED Storage (Duration 2h)
8.2 MW
Active - 2028-29 (T-4)
Land to the west of Slack Lane, West Houghton, Bolton, Greater Manchester, BL5 3LJ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
8.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land On The North And South Of Brinsworth Road, Brinsworth, Rotherham S60 5EN (1 components)

A 40MW Distribution Connected Battery Energy Storage System

ROOT-POWER (SOUTH) LIMITED Storage (Duration 2h)
8.4 MW
Active - 2028-29 (T-4)
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
  • • A Battery Energy Storage System
  • • A distribution connected Battery Energy Storage System
ETP-QQR ENERGY LIMITED Storage (Duration 2h)
8.4 MW
Active - 2028-29 (T-4), 2025-26 (T-4)
Higglers Farm, Titchfield Lane, Wickham, Hampshire, PO17 5PQ (2 components)
  • • New Build CMU comprising of Solar PV and associated plant
  • • New Build CMU comprising of battery storage and associated plant
CONRAD ENERGY (DEVELOPMENTS) II LIMITED Solar Photovoltaic Storage (Duration 2h)
8.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Inchbean Farm, Kilmarnock, East Ayrshire, KA1 5JP (1 components)

The CMU component is an energy storage system comprised of lithium ion batteries and associated infrastructure.

BSSL EAST AYRSHIRE 1 LTD Storage (Duration 2h)
8.8 MW
Active - 2028-29 (T-4)
72-77 Lower Tower Street, Hockley, Birmingham, B19 3NF (1 components)

New build battery storage

VOLTARIA BES 101 LTD Storage (Duration 2h)
8.9 MW
Active - 2028-29 (T-4)
Showing locations 1 - 50 of 157