Search Map View Statistics Support Us Help Login Register

Storage (Duration 2h)

177 unique locations 482 components 0 companies Page 1 of 4
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
  • • Battery Storage plant
  • • Gas reciprocating engines
  • • Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
  • • ... and 1 more unique descriptions
THURROCK POWER LIMITED Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
817.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Birkhill Commercial Park, Coalburn, S Lanarkshire, ML11 0FT (3 components)
  • • New Build Battery Storage (2)
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 4 LIMITED Storage (Duration 2h)
197.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-1)
Todrig Farm Coldstream TD12 4JA (5 components)

A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and … (2)

ECCLES ENERGY CENTRE LIMITED Storage (Duration 2h)
148.1 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Plutus Energy LTD Storage (Duration 2h)
107.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • ... and 2 more unique descriptions
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
89.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (2 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
86.2 MW
Active - 2027-28 (T-4)
Land close to Smeaton Shaw Farm, Dalkeith, EH22 2NL (2 components)

2H duration Lithium Ion Battery Storage New Build CMU. (2)

KONA ASSET 3 LIMITED Storage (Duration 2h)
70.3 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
  • • Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
67.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Broken Cross, S Lanarkshire, ML11 9PB (2 components)
  • • New Build Battery Storage
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 6 LIMITED Storage (Duration 2h)
61.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Land at Devilla Forest, Near Culross, Fife, KY12 8EW (2 components)
  • • New Build Battery Storage
  • • New build battery storage
ALCEMI STORAGE DEVELOPMENTS 3 LIMITED Storage (Duration 2h)
61.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Shipley Road, Goffsland Farm, Shipley, Horsham, West Sussex, England, RH13 8PA, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE43 Limited Storage (Duration 2h)
61.4 MW
Active - 2027-28 (T-4)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
  • • 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
  • • 75MW battery storage located near to the National Grid Stalybridge substation.
Zenobe Stalybridge Limited Storage (Duration 2h) Storage (Duration 4h)
58.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Somerford Farm, SN16 9RN (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
PD688IRO LTD Storage (Duration 2h) Storage (Duration 8h)
58.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Calow Green, Calow, North East Derbyshire, S44 5XQ (8 components)

A stand alone Battery Energy Storage System. (2)

ADV 005 LIMITED Storage (Duration 2h) Storage (Duration 9.5h)
53.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4)
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
50.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Station Road, Southfleet, Dartford, Kent, England, DA13 9PA, United Kingdom (1 components)

The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.

CSE41 Limited Storage (Duration 2h)
46.0 MW
Active - 2027-28 (T-4)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
43.1 MW
Active - 2027-28 (T-4)
Thorpe Marsh Ash Fields, Ash Fields Road, off Marsh Lane, Thorpe in Balne/Barnby Dun, Doncaster, DN6 0EA (1 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
43.1 MW
Active - 2027-28 (T-4)
Thorpe Marsh Ash Fields Ash Fields Road off Marsh Lane Thorpe in Balne/Barnby Dun Doncaster DN6 0EA (1 components)

New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.

THORPE MARSH GREEN ENERGY HUB LIMITED Storage (Duration 2h)
43.1 MW
Active - 2027-28 (T-4)
Land to the west of Pound Road, Axminster EX135UP (2 components)
  • • A 120.000 MW / 180.000 MWh battery energy storage system
  • • A 120.000 MW / 240.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
42.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

STOR 149 LTD Storage (Duration 2h)
39.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Linton, Highnam, Tewkesbury, Gloucestershire GL2 8AA (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

STOR 136 LTD Storage (Duration 2h)
39.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System (3)

HD192RAY LTD Storage (Duration 2h)
38.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Staythorpe BESS, Staythorpe Road, Nottinghamshire, NG23 5RE (1 components)

The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
36.0 MW
Active - 2027-28 (T-4)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
  • • A Battery Energy Storage System. (3)
  • • A New Build Gas fuelled power plant.
HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Newburn Bridge Road, Peth Lane Farm, Stella, NE21 4NT (2 components)

2 hour containerised battery storage (2)

CAPELLA BESS LTD Storage (Duration 2h)
35.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Sanquhar II Sanquhar Dumfries and Galloway DG4 6LF (1 components)

250 MW 2h BESS (on Day 1) that is entered at 217 MW 2h to account for degradation through 15year life.

SANQUHAR II COMMUNITY BATTERY COMPANY LIMITED Storage (Duration 2h)
33.4 MW
Active - 2027-28 (T-4)
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
  • • CMU ID 22KIN4, a new build battery storage CMU
  • • CMU ID 23KIN4, a new build battery storage CMU
WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 9h)
32.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (4 components)
  • • A New Build Gas fuelled power plant at Kirkby substation. (2)
  • • A New Build Transmission Connected Battery Energy Storage System. (2)
HD001KIR LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
32.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2023-24 (T-4) (and 1 more)
The land at Rownall Hall Farm, Rownall Road, Wetley Rocks, Stoke-on-Trent, ST9 0BS (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.

C & S ENERGY LIMITED Storage (Duration 2h)
31.5 MW
Active - 2027-28 (T-4)
Land Near To Monks House, Westerleigh, BS37 8RD (2 components)

BESS with Lit-Ion technology, 2 hours duration

RENBAT 6 LIMITED Storage (Duration 2h)
30.6 MW
Active - 2027-28 (T-4)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
  • • New Build 99.9 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
KEADBY GENERATION LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (24 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
29.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Showing locations 1 - 50 of 177