• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
-
• ... and 1 more unique descriptions
2549.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Battery Storage plant
-
• Gas reciprocating engines
-
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
-
• ... and 1 more unique descriptions
817.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
-
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
-
• 50MW battery storage located near to the SPT Eccles substation
-
• 50MW battery storage located near to the SPT Eccles substation.
-
• ... and 1 more unique descriptions
197.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• New Build Battery Storage
(2)
-
• New build battery storage
197.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-1)
Battery Storage Plant
(2)
181.6 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on agricultural land to the west of Eccles Substation and …
(2)
148.1 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
Battery Storage Plant
(2)
145.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
A Battery Energy Storage System.
(4)
116.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
(2)
107.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
-
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• ... and 2 more unique descriptions
93.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
(3)
89.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
86.2 MW
Active -
2027-28 (T-4)
2H duration Lithium Ion Battery Storage New Build CMU.
(2)
70.3 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
67.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
Battery Storage Plant
(2)
63.8 MW
Active -
2027-28 (T-4),
2025-26 (T-1)
-
• New Build Battery Storage
-
• New build battery storage
61.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• New Build Battery Storage
-
• New build battery storage
61.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
61.4 MW
Active -
2027-28 (T-4)
-
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
-
• 75MW battery storage located near to the National Grid Stalybridge substation.
58.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System.
58.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
A stand alone Battery Energy Storage System.
(2)
53.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
(2)
50.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
A Battery Energy Storage System.
(4)
47.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
The proposed battery plant would consist of a number of new highly efficient battery storage units plus ancillary equipment.
46.0 MW
Active -
2027-28 (T-4)
-
• A new build battery energy storage system
(2)
-
• A new build 99.9MW battery energy storage system
45.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
Battery Storage Plant
44.6 MW
Active -
2027-28 (T-4)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
43.1 MW
Active -
2027-28 (T-4)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
43.1 MW
Active -
2027-28 (T-4)
New-build generating CMU comprising battery storage and associated plant to be constructed on brownfield land at Thorpe Marsh, Yorkshire. Metering of output is Net of auxillary load.
43.1 MW
Active -
2027-28 (T-4)
-
• A 120.000 MW / 180.000 MWh battery energy storage system
-
• A 120.000 MW / 240.000 MWh battery energy storage system
42.2 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Battery Project on Greenfield Site
(4)
41.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
Energy facility comprising of battery energy storage sets and ancillary equipment.
(2)
39.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Energy facility comprising of battery energy storage sets and ancillary equipment.
(2)
39.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
A Battery Energy Storage System
(3)
38.9 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
The CMU is a Battery Energy Storage System with a planned 437MW active power output, consisting of containerised batteries.
36.0 MW
Active -
2027-28 (T-4)
-
• A Battery Energy Storage System.
(3)
-
• A New Build Gas fuelled power plant.
35.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
2 hour containerised battery storage
(2)
35.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
250 MW 2h BESS (on Day 1) that is entered at 217 MW 2h to account for degradation through 15year life.
33.4 MW
Active -
2027-28 (T-4)
New Build Battery Storage Site.
(2)
32.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4)
-
• CMU ID 22KIN4, a new build battery storage CMU
-
• CMU ID 23KIN4, a new build battery storage CMU
32.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• A New Build Gas fuelled power plant at Kirkby substation.
(2)
-
• A New Build Transmission Connected Battery Energy Storage System.
(2)
32.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2023-24 (T-4)
(and 1 more)
2 hour 210 MW battery Storage new build
32.3 MW
Active -
2027-28 (T-4)
Battery energy storage facility with a 2 hour duration and a maximum capacity of 300MW, located in Stoke.
31.5 MW
Active -
2027-28 (T-4)
BESS with Lit-Ion technology, 2 hours duration
30.6 MW
Active -
2027-28 (T-4)
-
• New Build Battery Energy Storage system
(2)
-
• New Build 49.99 MW Battery Energy Storage system
30.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• New Build Battery Energy Storage system
(2)
-
• New Build 49.5 MW Battery Energy Storage system
30.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• New Build 99.9 MW Battery Energy Storage system
-
• New Build Battery Energy Storage system
30.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Battery energy storage unit
(3)
29.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)