-
• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
-
• ... and 1 more unique descriptions
2549.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• Battery Storage plant
-
• Gas reciprocating engines
-
• Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
-
• ... and 1 more unique descriptions
817.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
-
• 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
-
• 50MW battery storage located near to the SPT Eccles substation
-
• 50MW battery storage located near to the SPT Eccles substation.
-
• ... and 1 more unique descriptions
197.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
(2)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
-
• ... and 1 more unique descriptions
124.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
A Battery Energy Storage System.
(4)
116.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.
(2)
107.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
(3)
89.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
A Battery Energy Storage System
79.8 MW
Active -
2026-27 (T-4)
-
• Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
67.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
A Battery Energy Storage System.
(3)
59.5 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
-
• 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
-
• 75MW battery storage located near to the National Grid Stalybridge substation.
58.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System.
58.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.
53.2 MW
Active -
2026-27 (T-4)
A Battery Energy Storage System
53.2 MW
Active -
2026-27 (T-4)
The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.
(2)
50.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
-
• 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
47.3 MW
Active -
2026-27 (T-4)
2H duration Lithium Ion Battery Storage New Build CMU.
47.3 MW
Active -
2026-27 (T-4)
-
• A new build battery energy storage system
(2)
-
• A new build 99.9MW battery energy storage system
45.8 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
This is a 99.9MW battery storage facility connected at 132kV.
(2)
43.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1)
-
• A 120.000 MW / 180.000 MWh battery energy storage system
-
• A 120.000 MW / 240.000 MWh battery energy storage system
42.2 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Battery Project on Greenfield Site
(4)
41.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
-
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
-
• BESS to be installed within a Greener Grid Park
39.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
Energy facility comprising of battery energy storage sets and ancillary equipment.
(2)
39.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Energy facility comprising of battery energy storage sets and ancillary equipment.
(2)
39.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
A Battery Energy Storage System
(3)
38.9 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• BESS project to be installed within a future Greener Grid Park.
(3)
-
• 50MW of BESS to be installed within a future Greener Grid Park.
(2)
38.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
2 hour containerised battery storage
(2)
35.6 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
34.7 MW
Active -
2028-29 (T-4),
2026-27 (T-4)
CMU to comprise multiple individual storage units metered and despatched centrally
(3)
34.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
-
• CMU ID 22KIN4, a new build battery storage CMU
-
• CMU ID 23KIN4, a new build battery storage CMU
32.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
-
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
(3)
-
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield …
(2)
30.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
-
• New Build Battery Energy Storage system
(2)
-
• New Build 49.99 MW Battery Energy Storage system
30.5 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• New Build Battery Energy Storage system
(2)
-
• New Build 49.5 MW Battery Energy Storage system
30.4 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• New Build 99.9 MW Battery Energy Storage system
-
• New Build Battery Energy Storage system
30.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
Battery energy storage unit
(3)
29.9 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• A Battery Energy Storage System
(2)
-
• A gas fuelled generating station.
28.9 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-4)
Battery Energy Storage Site
(2)
28.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
(2)
27.3 MW
Active -
2027-28 (T-4),
2026-27 (T-4)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
27.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• New build two-hour duration battery storage
(2)
-
• New build one-hour duration storage
26.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
Standalone Battery Storage Asset
(3)
25.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
Lithium-based battery energy storage system.
(3)
24.4 MW
Active -
2026-27 (T-4),
2025-26 (T-1),
2024-25 (T-1)
Battery energy storage unit
(3)
24.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
Battery energy storage unit
(3)
24.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
(2)
-
• The CMU comprises lithium ion batteries and is capable of exporting the declared capacity for a duration of 2 hours.
23.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-1)
A 49.400 MW / 98.800 MWh battery energy storage system
23.3 MW
Active -
2026-27 (T-4)
98MW / 196MWh BESS
23.2 MW
Active -
2026-27 (T-4)
98 MW / 196MWh BESS
23.2 MW
Active -
2026-27 (T-4)