Search Map View Statistics Support Us Help Login Register

Storage (Duration 2h)

177 unique locations 442 components 0 companies Page 1 of 4
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
land at Walton Common north of the National Grid Substation, Fort Road, Tilbury, RM18 8UL. (6 components)
  • • Battery Storage plant
  • • Gas reciprocating engines
  • • Thurrock Power Limited has secured a "blue chip" manufacturer as the EPC contractor to engineer, procure and construct a battery …
  • • ... and 1 more unique descriptions
THURROCK POWER LIMITED Reciprocating engines Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
817.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Eccles Birgham Farm TD12 4LU (9 components)
  • • 400MW battery storage located near to the SPT Eccles substation, split into four BMU's
  • • 50MW battery storage located near to the SPT Eccles substation
  • • 50MW battery storage located near to the SPT Eccles substation.
  • • ... and 1 more unique descriptions
ZENOBE ECCLES LIMITED Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 8h)
197.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Netherton Farm, Keith AB55 5PE (12 components)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
  • • ... and 1 more unique descriptions
ZENOBE BLACKHILLOCK LIMITED Storage (Duration 2h) Storage (Duration 4h)
124.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (2 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries. (2)

Plutus Energy LTD Storage (Duration 2h)
107.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Ferrybridge BESS, Knottingley, Ferrybridge, Wakefield, West Yorkshire, Yorkshire. WF11 8TB (3 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (3)

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
89.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Land off Barge Way, Kemsley Fields Business Park, Sittingbourne ME10 2FE (4 components)
  • • Grid scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
67.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
BSB Transport Ltd Trondheim Way, Redwood Park Estate, Stallingborough, Grimsby, North East Lincolnshire, DN41 8FD. (4 components)

A Battery Energy Storage System. (3)

KXP IMMINGHAM LIMITED Storage (Duration 2h)
59.5 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
adjacent to National Grid Stalybridge substation SK15 3DA (3 components)
  • • 150MW battery storage located near to the National Grid Stalybridge substation, split into two BMU's
  • • 75MW battery storage located near to the National Grid Stalybridge substation.
Zenobe Stalybridge Limited Storage (Duration 2h) Storage (Duration 4h)
58.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Somerford Farm, SN16 9RN (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
PD688IRO LTD Storage (Duration 2h) Storage (Duration 8h)
58.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Cleve Hill, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (1 components)

A new build 230MW/460MWh battery storage facility connected to the National Grid Transmission network at 132kV, located at Cleve Hill.

CLEVE HILL SOLAR PARK LIMITED Storage (Duration 2h)
53.2 MW
Active - 2026-27 (T-4)
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries. (2)

SSE UTILITY SOLUTIONS LIMITED Storage (Duration 2h)
50.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
adjacent to Kilmarnock South Substation KA1 3TN (2 components)
  • • 200MW battery storage located near to the SPT Kilmarnock South substation, split into two BMU's
  • • 200MW battery storage located near to theSPT Kilmarnock South substation, split into two BMU's
ZENOBE KILMARNOCK SOUTH LIMITED Storage (Duration 2h)
47.3 MW
Active - 2026-27 (T-4)
LAND SOUTH OF WAKEFIELD B SUBSTATION AND EAST OF NEIL FOX WAY, WAKEFIELD, WF1 5DB (3 components)
  • • A new build battery energy storage system (2)
  • • A new build 99.9MW battery energy storage system
HARMONY WB (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
45.8 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Lakeside Energy Storage facility, New Road, Long Drax, Selby, North Yorkshire, Y08 8FP (2 components)

This is a 99.9MW battery storage facility connected at 132kV. (2)

Plutus Energy LTD Storage (Duration 2h) Storage (Duration 1.5h)
43.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1)
Land to the west of Pound Road, Axminster EX135UP (2 components)
  • • A 120.000 MW / 180.000 MWh battery energy storage system
  • • A 120.000 MW / 240.000 MWh battery energy storage system
ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
42.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Fairy Lane, Sale, Trafford, Greater Manchester M33 2JU (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

STOR 149 LTD Storage (Duration 2h)
39.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Linton, Highnam, Tewkesbury, Gloucestershire GL2 8AA (2 components)

Energy facility comprising of battery energy storage sets and ancillary equipment. (2)

STOR 136 LTD Storage (Duration 2h)
39.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System (3)

HD192RAY LTD Storage (Duration 2h)
38.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
  • • BESS project to be installed within a future Greener Grid Park. (3)
  • • 50MW of BESS to be installed within a future Greener Grid Park. (2)
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 8h) Storage (Duration 3.5h)
38.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Newburn Bridge Road, Peth Lane Farm, Stella, NE21 4NT (2 components)

2 hour containerised battery storage (2)

CAPELLA BESS LTD Storage (Duration 2h)
35.6 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land to the north of Stoke Lane, Norwich, NR14 8QD (3 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours.
FLEXION ENERGY SPV 2 LTD Storage (Duration 2h)
34.7 MW
Active - 2028-29 (T-4), 2026-27 (T-4)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Sembcorp Utilities (UK) Limited Storage (Duration 2h)
34.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1)
Land at Crown Farm, adjacent to Walpole Bank Road, Walpole, PE14 7JA (2 components)
  • • CMU ID 22KIN4, a new build battery storage CMU
  • • CMU ID 23KIN4, a new build battery storage CMU
WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 9h)
32.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
  • • A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (3)
  • • A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield … (2)
GATEWAY ENERGY CENTRE LIMITED Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
30.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 1 more)
LAND EAST OF HOLMFIELD LANE, CASTLEFORD, WF11 8SF (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.99 MW Battery Energy Storage system
HARMONY CAS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.5 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land to the North and East of Flatworth Substation, High Flatworth, North Shields, NE29 7SU (4 components)
  • • New Build Battery Energy Storage system (2)
  • • New Build 49.5 MW Battery Energy Storage system
HARMONY FW LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.4 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
LAND ON CHAPEL LANE, SALISBURY HOUSE FARM, KEADBY, SCUNTHORPE, DN17 3EY (2 components)
  • • New Build 99.9 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
KEADBY GENERATION LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
30.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land off Petre Street, Grimesthorpe, Sheffield, Yorkshire and the Humber, S4 8LU (24 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
29.9 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land at Legacy Substation, Bronwylfa Road, Legacy, Wrexham, LL14 4HY (3 components)
  • • A Battery Energy Storage System (2)
  • • A gas fuelled generating station.
HD639LEG LIMITED Reciprocating engines Storage (Duration 2h)
28.9 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-4)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
Plot C, Land at Severn Road Avonmouth BS10 7SE (3 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)

Willington Power Limited Storage (Duration 2h)
27.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 2h) Storage (Duration 9h)
27.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Ipswich Road, Cardiff, CF23 9AQ (10 components)
  • • New build two-hour duration battery storage (2)
  • • New build one-hour duration storage
GFV-1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
26.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land south of Walpole Substation, Walpole Bank, Norfolk, PE14 7JE. (3 components)

Lithium-based battery energy storage system. (3)

WALPOLE GREEN LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
24.4 MW
Active - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1)
Land Off Darnall Road, Sheffield, South Yorkshire, S9 5AB (21 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
24.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land At Junction With Hunsley Street and Carlisle Road, Sheffield, S4 8DQ (21 components)

Battery energy storage unit (3)

FRP MERCIA HOLDCO 2 LIMITED Storage (Duration 2h)
24.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4)
Land on the east side of Meaford Road, Barlaston, Stoke-on-Trent, ST15 0UU (3 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours (2)
  • • The CMU comprises lithium ion batteries and is capable of exporting the declared capacity for a duration of 2 hours.
PULSE CLEAN ENERGY SPV RUBIN LIMITED Storage (Duration 2h)
23.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1)
Land at Impens Farm, Petherton Road, North Newton, Bridgwater, Somerset, TA7 0BB (2 components)

A 49.400 MW / 98.800 MWh battery energy storage system

ENSO GREEN HOLDINGS LIMITED Storage (Duration 2h)
23.3 MW
Active - 2026-27 (T-4)
Showing locations 1 - 50 of 177