177 unique locations 442 components 0 companies Page 1 of 4
Map View
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (3 components)

New Build CMU comprising of battery storage and associated plant (3)

CONRAD (ST PHILIPS) LIMITED Storage (Duration 1h) Storage (Duration 2h)
1.0 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2023-24 (T-1)
Land at Private Road No.5, Colwick Industrial Estate, Nottingham, NG4 2JU (6 components)

Battery energy storage unit (6)

FRP MERCIA HOLDCO LIMITED Storage (Duration 2h)
1.2 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 3 more)
Welwyn Power, Tewin Road, Welwyn Garden City, AL7 1BH (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
1.2 MW
Active - 2026-27 (T-4)
Causeway Power, The Causeway Industrial Site, Maldon, CM9 4GG (1 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
1.2 MW
Active - 2026-27 (T-4)
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
1.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Land at Dunhams Lane, Letchworth Garden City, SG6 1JH (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)

URBAN RESERVE STORAGE LIMITED Storage (Duration 2h)
1.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Land on West of St Michaels Road Widnes, WA8 8TB. (1 components)

New Build CMU comprising of battery storage and associated plant.

Shell Green Ltd Storage (Duration 2h)
1.3 MW
Active - 2026-27 (T-4)
Land at Keithick Estate, PH13 9LZ (2 components)

New Build CMU comprising of battery storage and associated plant (2)

SIRIUS ECODEV (KEITHICK) LTD Storage (Duration 2h)
1.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Rawmarsh Road, Rotherham, S60 1RU (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
2.1 MW
Active - 2026-27 (T-4)
Slack Lane, Westhoughton, BL5 3LB (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
2.1 MW
Active - 2026-27 (T-4)
Smithyard Lane, Williton, TA4 4NN (2 components)

New Build CMU comprising of battery storage and associated plant (2)

CONRAD ENERGY (DEVELOPMENTS) LIMITED Storage (Duration 2h)
2.2 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Buxton Power Limited Storage (Duration 2h)
2.2 MW
Active - 2026-27 (T-4)
Coxhall Power, Coxhall Road, Tattingstone, Ipswich, IP9 2NH (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h)
2.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (MIDSOMER) LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (2 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX]. (2)

AVILS CONSULTING LIMITED Storage (Duration 2h)
2.4 MW
Inactive - 2026-27 (T-4), 2023-24 (T-1)
Land at Frodo Solar Farm, Moss-side, Crimond, Fraserburgh, Grampian, AB43 8YH (1 components)

New Build CMU comprising of battery storage and associated plant.

LEL FRODO BATTERY LIMITED Storage (Duration 2h)
2.4 MW
Active - 2026-27 (T-4)
Land At STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 components)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 16 MW, located in Buxton.

Buxton Power Limited Storage (Duration 2h)
2.5 MW
Active - 2026-27 (T-4)
Land at Sterte Avenue West, Poole, BH15 2AL (12 components)
  • • A 7.5MW Tesla Battery Energy Storage System (4)
  • • Tesla Battery Energy Storage System
HARMONY HB LIMITED Storage Storage (Duration 1h) Storage (Duration 2h)
2.5 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 7 more)
The Manorway, Stanford-le-Hope, SS17 9LL (3 components)
  • • A Battery Energy Storage System (2)
  • • Reciprocating engines of 6 mW.
CORPOWER LIMITED Storage (Duration 1h) Storage (Duration 2h)
2.7 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2020-21 (T-4)
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components)
  • • Gas fired reciprocating engines
  • • New Build Generating CMU comprising of battery storage and associated plant.
COTRICITY LIMITED Storage (Duration 2h) OCGT and Reciprocating Engines (Fuel Type - Gas)
2.8 MW
Inactive - 2026-27 (T-4), 2021-22 (T-4)
Land off Woburn Road, Kempston, Bedford, MK43 9AB (1 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

EL ASSET CO. 2 LIMITED Storage (Duration 2h)
2.8 MW
Active - 2026-27 (T-4)
South West side of the A444, Castle Gresley, DE11 9ES (1 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

ENERSYST LIMITED Storage (Duration 2h)
3.1 MW
Active - 2026-27 (T-4)
Newby Power, Unit 9, Newby Road Industrial Estate, Stockport, SK7 5DA (2 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV …
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h)
3.4 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel. (2)

RWE GENERATION UK PLC Storage (Duration 2h)
3.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Land adjacent to Norrington Common BSP, Norrington Lane, Broughton Gifford, Melksham, SN12 8LT (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
3.6 MW
Active - 2026-27 (T-4)
Land Adjacent to Belfield Substation, Belfield Road, Rochdale, Manchester, OL16 2XX (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
4.0 MW
Active - 2026-27 (T-4)
Slack Lane, Westhoughton, BL5 3QH (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
4.3 MW
Active - 2026-27 (T-4)
Main Ave., Hirwaun, Rhondda Cynon Taff, CF44 9UY (4 components)
  • • New build one-hour duration storage to replace diesel plant (2)
  • • New build two-hour duration storage to replace diesel plant (2)
PULSE CLEAN ENERGY UK LIMITED Storage (Duration 1h) Storage (Duration 2h)
4.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 components)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

SOUTH FAMBRIDGE HALL SOLAR PARK LIMITED Storage (Duration 2h)
4.6 MW
Active - 2026-27 (T-4)
School Power, Rochester Road, Wouldham, Rochester, ME1 3TS (4 components)
  • • CMU component consisting of multiple battery cells for electricity storage @ 11kV and the supply of electricity to the 11kV … (2)
  • • CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid (2)
URBAN RESERVE STORAGE LIMITED Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 3.5h)
4.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-1) (and 1 more)
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (4 components)
  • • This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable … (3)
  • • This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable …
ECOTRICITY (SMART GRID) LIMITED Storage (Duration 2h)
5.1 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
Pyworthy, Torridge District, Devon, EX22 6LQ (1 components)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

AVILS CONSULTING LIMITED Storage (Duration 2h)
5.9 MW
Active - 2026-27 (T-4)
Land off Bilport Lane, Wednesbury, WS10 0PD (1 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

FPC ELECTRIC LAND LIMITED Storage (Duration 2h)
5.9 MW
Active - 2026-27 (T-4)
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (6 components)
  • • New build one-hour duration storage
  • • New build two-hour duration battery storage
GFV-4 LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
  • • CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares …
  • • CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system …
DRIFFIELD SOLAR AND STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
6.3 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
Land at Tuxton Farm, Plympton, Plymouth, PL7 5AA (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4)
The Common, Malmesbury, SN16 9RJ (2 components)
  • • New Build CMU comprising of battery storage and associated plant
  • • New Build Generating CMU comprising of battery storage and associated plant.
CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 1h) Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Leafield Battery Site, Monks Lane, Corsham SN13 9PH (4 components)

electricity storage site comprising brand new batteries, inverters and associated connection plant (2)

LEAFIELD ENERGY LIMITED Storage (Duration 1h) Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Edwin Richards Quarry, Rowley Regis, B65 9DN (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4)
Wellington Street, Oldham, Lancashire OL4 1SA (7 components)
  • • Energy facility comprising of battery energy storage sets and ancillary equipment. (3)
  • • Energy facility comprising of reciprocating engine sets and ancillary equipment. (2)
STOR 108 LTD Reciprocating engines Storage (Duration 2h)
7.1 MW
Inactive - 2026-27 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Farburn?Place, Dyce, Aberdeen, AB21 7GP (2 components)

Battery Storage 2 hour duration (2)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4), 2024-25 (T-1)
Land adjacent to Taunton GSP Substation, TA4 1AG (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4)
Haddon Farm, Haddons Lane, Claveshay, North Petherton, Bridgwater, TA6 6PG (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4)
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 components)

New Build Generating CMU comprising of battery storage and associated plant.

CONRAD ENERGY (DEVELOPMENTS) II LIMITED Storage (Duration 2h)
7.1 MW
Active - 2026-27 (T-4)
land north of The Brickmakers Arms, Woburn Road, Kempston, Bedfordshire, MK43 9AB (6 components)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 1.5MW of storage capacity. (3)
  • • A 12MW containerised Energy Storage System (lithium ion batteries) with 2 hours of storage capacity. (2)
GRIDSOURCE (WOBURN RD) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.2 MW
Inactive - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 3 more)
Winchester power Generation Plant, Port Lane, Hursley, Winchester, SO21 2UZ (4 components)
  • • Existing CMU comprising of battery storage and associated plant (2)
  • • New Build CMU comprising of battery storage and associated plant (2)
CONRAD (WINCHESTER) LIMITED Storage (Duration 2h)
7.3 MW
Inactive - 2026-27 (T-4), 2025-26 (T-1), 2024-25 (T-1) (and 1 more)
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
  • • New Build 25 MW Battery Energy Storage system
  • • New Build Battery Energy Storage system
HARMONY HS (JV) LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
LAND EAST OF LEDSTON SUBSTATION, LEDSTON, WEST YORKSHIRE, WF10 2AW (2 components)

New Build 25 MW Battery Energy Storage system (2)

HARMONY LS LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
7.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4)
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

PIVOTED POWER LLP Storage (Duration 2h)
7.6 MW
Active - 2026-27 (T-4)