-
• Gas CHP on South bank of river Humber providing electricity and industrial steam
(8)
-
• New build gas reciprocating multi-engine generating plant
(4)
-
• Battery storage unit
3439.5 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
-
• BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
-
• ... and 2 more unique descriptions
3416.0 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
(2)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
-
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
-
• ... and 1 more unique descriptions
2549.8 MW
Inactive -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 7 more)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
(2)
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
-
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
-
• ... and 1 more unique descriptions
124.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
A Battery Energy Storage System.
(4)
116.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
-
• 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
-
• ... and 2 more unique descriptions
93.4 MW
Inactive -
2027-28 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 3 more)
A Battery Energy Storage System.
(2)
79.3 MW
Active -
2028-29 (T-4),
2025-26 (T-4)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System.
58.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
A Battery Energy Storage System.
(4)
47.0 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
Battery Project on Greenfield Site
(4)
41.7 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
-
• 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
-
• BESS to be installed within a Greener Grid Park
39.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
A Battery Energy Storage System
(3)
38.9 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• BESS project to be installed within a future Greener Grid Park.
(3)
-
• 50MW of BESS to be installed within a future Greener Grid Park.
(2)
38.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 2 more)
-
• A Battery Energy Storage System.
(3)
-
• A New Build Gas fuelled power plant.
35.7 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2025-26 (T-4)
(and 1 more)
CMU to comprise multiple individual storage units metered and despatched centrally
(3)
34.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-1)
-
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed …
(3)
-
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield …
(2)
30.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 1 more)
Battery Energy Storage Site
(2)
28.1 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
27.1 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• New build two-hour duration battery storage
(2)
-
• New build one-hour duration storage
26.0 MW
Active -
2028-29 (T-4),
2026-27 (T-4),
2025-26 (T-4)
Standalone Battery Storage Asset
(3)
25.6 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
A Battery Energy Storage System.
(3)
22.2 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 Hour Battery Storage Plant.
-
• ... and 1 more unique descriptions
22.0 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
20.3 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
Battery Storage Plant
(4)
20.2 MW
Active -
2028-29 (T-4),
2027-28 (T-4),
2026-27 (T-4)
(and 1 more)
-
• A Battery Energy Storage System
(3)
-
• A Battery Energy Storage System.
19.5 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
(and 1 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build 48MW battery energy storage system
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 4 more)
-
• 49.5MW Battery Energy Storage facility
(2)
-
• 48MW Battery Energy Storage facility
-
• 49.9MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 1 more)
-
• 49.5MW Battery Energy Storage facility
(3)
-
• 48MW Battery Energy Storage facility
-
• Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 4 more)
-
• 49.5MW Battery Energy Storage facility connected to 132kv network
(4)
-
• 48MW Battery Energy Storage facility connected to 132kv network
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2023-24 (T-1)
(and 3 more)
-
• 49.5 MW Battery Energy Storage facility
(3)
-
• 48 MW Battery Energy Storage facility
18.3 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 3 more)
-
• A new build 49.5MW battery energy storage system
(4)
-
• A new build battery energy storage system
17.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 6 more)
The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.
(3)
16.9 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
-
• New Build 2 hour battery storage system.
-
• ... and 1 more unique descriptions
16.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 1 more)
-
• New build battery storage
(3)
-
• BATTERY STORAGE PLANT
-
• New build generating storage unit
15.7 MW
Inactive -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
(and 1 more)
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
14.0 MW
Active -
2027-28 (T-4),
2026-27 (T-4),
2025-26 (T-4)
-
• New build 35MW Battery Energy Storage System
(2)
-
• Lithium-ion Battery Energy Storage System
13.0 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
A Battery Energy Storage System.
(2)
11.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
A Battery Energy Storage System
(2)
11.2 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
-
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
10.8 MW
Active -
2027-28 (T-4),
2025-26 (T-4)
Brigg Battery 2 hour duration
(3)
9.8 MW
Active -
2028-29 (T-4),
2025-26 (T-4),
2024-25 (T-1)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
9.6 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 2 more)
Battery Storage Plant
(5)
9.0 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2024-25 (T-4)
(and 7 more)
-
• New Build CMU comprising of battery storage and associated plant
(3)
-
• Existing CMU comprising of battery storage and associated plant
(2)
8.7 MW
Inactive -
2026-27 (T-4),
2025-26 (T-4),
2025-26 (T-1)
(and 3 more)
-
• Battery Storage Plant
(4)
-
• Gas peaking reciprocating engines
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
Battery Storage Plant
(5)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-4),
2024-25 (T-1)
(and 6 more)
Battery Storage Plant
(4)
8.6 MW
Inactive -
2025-26 (T-4),
2024-25 (T-1),
2023-24 (T-1)
(and 1 more)
50MW of BESS to be installed within existing Rotating Stabiliser site.
(2)
8.5 MW
Active -
2026-27 (T-4),
2025-26 (T-4)
-
• A Battery Energy Storage System
-
• A distribution connected Battery Energy Storage System
8.4 MW
Active -
2028-29 (T-4),
2025-26 (T-4)