Search Map View Statistics Support Us Help Login Register

Storage (Duration 2h)

116 unique locations 334 components 0 companies Page 1 of 3
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
  • • Gas CHP on South bank of river Humber providing electricity and industrial steam (8)
  • • New build gas reciprocating multi-engine generating plant (4)
  • • Battery storage unit
VPI Immingham LLP Reciprocating engines Storage (Duration 2h) CHP and autogeneration Combined Heat and Power (CHP)
3439.5 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (74 components)
  • • BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
  • • BM unit T_DINO-3 at Dinorwig Power Station (Pumped Storage)
  • • ... and 2 more unique descriptions
First Hydro Company Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 6h) Storage (Duration 8h) Storage (Duration 9h) Storage (Duration 9.5h)
3416.0 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (49 components)
  • • New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
  • • Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
  • • ... and 1 more unique descriptions
Plutus Energy LTD Coal Storage Coal/biomass Storage (Duration 2h) Storage (Duration 4h) Open Cycle Gas Turbine (OCGT) Combined Cycle Gas Turbine (CCGT)
2549.8 MW
Inactive - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 7 more)
Netherton Farm, Keith AB55 5PE (12 components)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's (2)
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into four BMU's
  • • 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
  • • ... and 1 more unique descriptions
ZENOBE BLACKHILLOCK LIMITED Storage (Duration 2h) Storage (Duration 4h)
124.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (8 components)

A Battery Energy Storage System. (4)

PD688IRO LTD Storage (Duration 2h) Storage (Duration 4h) Storage (Duration 5h) Storage (Duration 8h)
116.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
132 Manchester Road, Carrington, Manchester, M31 4AY (17 components)
  • • 250MW capacity system with 500MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
  • • 49.5 MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • 5 x 4.5MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
  • • ... and 2 more unique descriptions
WAINSTONES ENERGY LIMITED Reciprocating engines Storage (Duration 2h) Storage (Duration 5h) Combined Cycle Gas Turbine (CCGT)
93.4 MW
Inactive - 2027-28 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 3 more)
Land lying at Southfields Farm, Garsdon, Malmesbury, SN16 9PQ (3 components)

A Battery Energy Storage System. (2)

PD503HAN LTD Storage (Duration 2h) Storage (Duration 8h)
79.3 MW
Active - 2028-29 (T-4), 2025-26 (T-4)
Land at Somerford Farm, SN16 9RN (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
PD688IRO LTD Storage (Duration 2h) Storage (Duration 8h)
58.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Land at Minety Substation, Stonehill Wood, Malmesbury, Wiltshire, SN16 9RP (4 components)

A Battery Energy Storage System. (4)

HB411MIN LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 8h)
47.0 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
Land to the south of National Grid's Rainhill Substation, Lea Green Road, Rainhill, WA9 4QD (5 components)

Battery Project on Greenfield Site (4)

SIZING JOHN LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
41.7 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
East Tarelgin Farm, Ayr, KA6 6NF (4 components)
  • • 18.5MW/74MWh of BESS to be installed within a future Greener Grid Park.
  • • 50MW/100MWh of BESS to be installed within a future Greener Grid Park.
  • • BESS to be installed within a Greener Grid Park
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 3h) Storage (Duration 4h) Storage (Duration 2.5h)
39.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System (3)

HD192RAY LTD Storage (Duration 2h)
38.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (6 components)
  • • BESS project to be installed within a future Greener Grid Park. (3)
  • • 50MW of BESS to be installed within a future Greener Grid Park. (2)
STATKRAFT UK LTD Storage (Duration 2h) Storage (Duration 8h) Storage (Duration 3.5h)
38.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 2 more)
Land at Iron Acton Substation, Larks Lane, Iron Acton, BS37 9TX (4 components)
  • • A Battery Energy Storage System. (3)
  • • A New Build Gas fuelled power plant.
HD000ACT LTD Reciprocating engines Storage (Duration 2h) Storage (Duration 5h)
35.7 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2025-26 (T-4) (and 1 more)
former Teesside Power Station; Greystone Road, Grangetown, Middlesbrough, TS6 8JF (6 components)

CMU to comprise multiple individual storage units metered and despatched centrally (3)

Sembcorp Utilities (UK) Limited Storage (Duration 2h)
34.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-1)
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
  • • A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed … (3)
  • • A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield … (2)
GATEWAY ENERGY CENTRE LIMITED Storage (Duration 2h) Open Cycle Gas Turbine (OCGT)
30.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 1 more)
Royle Barn Road, Rochdale, OL11 3DX (5 components)

Battery Energy Storage Site (2)

ADV 003 LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
28.1 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1)
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 2h) Storage (Duration 9h)
27.1 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Ipswich Road, Cardiff, CF23 9AQ (10 components)
  • • New build two-hour duration battery storage (2)
  • • New build one-hour duration storage
GFV-1 LIMITED Storage (Duration 1h) Storage (Duration 2h)
26.0 MW
Active - 2028-29 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land at Mill Hill Substation, Partingdale Road, Barnet, NW7 1NT (3 components)

A Battery Energy Storage System. (3)

HB333MIL LTD Storage (Duration 2h)
22.2 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
35-37 Sheffield Road, Newton, Hyde, SK14 2PU (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 42MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 Hour Battery Storage Plant.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
22.0 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Waterswallows Energy Limited Storage (Duration 2h)
20.3 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Grendon Lakes, Main Road, Grendon, Northampton, Northamptonshire NN7 1JW. (4 components)

Battery Storage Plant (4)

GRENDON LAKES STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
20.2 MW
Active - 2028-29 (T-4), 2027-28 (T-4), 2026-27 (T-4) (and 1 more)
Land at Axminster Substation, Pound Road, Axminster, Devon, EX13 5RX (4 components)
  • • A Battery Energy Storage System (3)
  • • A Battery Energy Storage System.
HB411MIN LTD Storage (Duration 2h)
19.5 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4) (and 1 more)
Clay Tye Farm, Clay Tye Road, Upminster, RM14 3PL (10 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build 48MW battery energy storage system
HARMONY CTF LIMITED Storage Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 4 more)
Land adjacent to Dunswell Road, Cottingham, East Yorkshire, HU16 4JS (5 components)
  • • 49.5MW Battery Energy Storage facility (2)
  • • 48MW Battery Energy Storage facility
  • • 49.9MW Battery Energy Storage facility
HARMONY (PW) 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 1 more)
Little Raith Farm, Auchtertool, Fife, KY5 0AX (8 components)
  • • 49.5MW Battery Energy Storage facility (3)
  • • 48MW Battery Energy Storage facility
  • • Battery Energy Storage facility
HEIT LR LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 4 more)
Clay Tye Road, Upminister, RM14 3PL (7 components)
  • • 49.5MW Battery Energy Storage facility connected to 132kv network (4)
  • • 48MW Battery Energy Storage facility connected to 132kv network
HARMONY CTF 2 LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2023-24 (T-1) (and 3 more)
Chapel Farm, Luton Road, Charlton, Luton, LU4 9UJ (7 components)
  • • 49.5 MW Battery Energy Storage facility (3)
  • • 48 MW Battery Energy Storage facility
HARMONY CF LIMITED Storage (Duration 2h) Storage (Duration 1.5h)
18.3 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 3 more)
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (12 components)
  • • A new build 49.5MW battery energy storage system (4)
  • • A new build battery energy storage system
HEIT BF LIMITED Storage Storage (Duration 2h) Storage (Duration 1.5h)
17.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2024-25 (T-4) (and 6 more)
Land north west of Braintree Substation Braintree Road Cressing, Braintree CM77 8EZ (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

PIVOTED POWER LLP Storage (Duration 2h) Storage (Duration 9h)
16.9 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Land Off 9 Coal Pit Lane, Atherton, Manchester, M46 0RL (5 components)
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
  • • New Build 2 hour battery storage system.
  • • ... and 1 more unique descriptions
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h) Storage (Duration 2.5h)
16.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 1 more)
Lowfields Way, Lowfields Business Park, HX5 9DA (5 components)
  • • New build battery storage (3)
  • • BATTERY STORAGE PLANT
  • • New build generating storage unit
GREENGRIDPOWER1 LTD Storage (Duration 2h)
15.7 MW
Inactive - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1) (and 1 more)
Land at Slack Lane, Westhoughton, Bolton BL5 3LG (5 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 30MW for a 1 hour duration installed on designated …
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h)
14.0 MW
Active - 2027-28 (T-4), 2026-27 (T-4), 2025-26 (T-4)
Rusholme Grange, Drax, YO8 8PW (4 components)
  • • New build 35MW Battery Energy Storage System (2)
  • • Lithium-ion Battery Energy Storage System
HARMONY RH LTD Storage (Duration 2h) Storage (Duration 1.5h)
13.0 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1)
Land at Fairholme, SN16 9PW (2 components)

A Battery Energy Storage System. (2)

HB222BRI LTD Storage (Duration 2h)
11.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Great Elm Farm, Pond Lane, Charlton, Wiltshire, SN16 9DS (2 components)

A Battery Energy Storage System (2)

HD381GRE LTD Storage (Duration 2h)
11.2 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Land off Stoke Lane, Norwich, NR14 8QD (3 components)
  • • Grid-scale energy storage system based on Lithium Ion technology, capable of exporting the declared capacity for the stated duration.
  • • Grid-scale energy storage system based on Lithium Ion, capable of exporting 50MW for a 1 hour duration installed on designated …
FPC ELECTRIC LAND LIMITED Storage (Duration 1h) Storage (Duration 2h)
10.8 MW
Active - 2027-28 (T-4), 2025-26 (T-4)
Scawby Brook, Brigg, Lincolnshire, DN20 9LT. (3 components)

Brigg Battery 2 hour duration (3)

CBS ENERGY STORAGE ASSETS UK LIMITED Storage (Duration 2h)
9.8 MW
Active - 2028-29 (T-4), 2025-26 (T-4), 2024-25 (T-1)
Bristol Avenue, Blackpool, FY2 0JF (5 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
CONRAD (BLACKPOOL) LIMITED Storage (Duration 1h) Storage (Duration 2h)
9.6 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 2 more)
Barton Hill Way, Torquay, TQ2 8JG (6 components)
  • • New Build CMU comprising of battery storage and associated plant (3)
  • • Existing CMU comprising of battery storage and associated plant (2)
Dockside Power Limited Storage (Duration 1h) Storage (Duration 2h)
8.7 MW
Inactive - 2026-27 (T-4), 2025-26 (T-4), 2025-26 (T-1) (and 3 more)
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (13 components)
  • • Battery Storage Plant (4)
  • • Gas peaking reciprocating engines
Penwortham Power Limited Storage Reciprocating engines Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-4), 2024-25 (T-1) (and 6 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG (7 components)

Battery Storage Plant (4)

MELKSHAM EAST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
LAND ON THE SOUTH SIDE OF FAIRY LANE, SALE, M33 2JU. (7 components)

Battery Storage Plant (4)

WEST DIDSBURY STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Located on the land of Westlands Farm, Westlands Lane, Whitley, Melksham, SN12 7QG. (7 components)

Battery Storage Plant (4)

MELKSHAM WEST STORAGE LIMITED Storage (Duration 1h) Storage (Duration 2h)
8.6 MW
Inactive - 2025-26 (T-4), 2024-25 (T-1), 2023-24 (T-1) (and 1 more)
Land Adjacent to No 13 Westerton Road Keith, Moray, Scotland AB55 5FA (2 components)

50MW of BESS to be installed within existing Rotating Stabiliser site. (2)

KEITH STORAGE SOLUTIONS LIMITED Storage (Duration 2h) Storage (Duration 4h)
8.5 MW
Active - 2026-27 (T-4), 2025-26 (T-4)
Goyt Hall Farm, Dark Lane, Romiley, Stockport SK6 3LH (2 components)
  • • A Battery Energy Storage System
  • • A distribution connected Battery Energy Storage System
ETP-QQR ENERGY LIMITED Storage (Duration 2h)
8.4 MW
Active - 2028-29 (T-4), 2025-26 (T-4)
Showing locations 1 - 50 of 116